Daftar Pustaka - Widyatama Repository

advertisement
DAFTAR PUSTAKA
Rujukan Buku :
Heizer, Jay. dan Barry Render. 2009. Manajemen Operasi. Salemba Empat : Jakarta
Husein, Abrar. 2009. Manajemen Proyek. Edisi Revisi. Andi : Jogjakarta.
Nurhayati. 2010. Manajemen Proyek. Graha Ilmu : Jogjakarta.
Djokosetyardjo. 2003. Ketel Uap. Pradnya Paramita : Jakarta.
Nilasari, Irma dan Sri Wiludjeng. 2006. Pengantar Bisnis. Graha Ilmu : Jogjakarta.
Wiludjeng, Sri. 2007. Pengantar Manajemen. Graha Ilmu : Jogjakarta.
Jackson, Jhon H. & Musselman, Vernon A. 1992 Business : Contempory Concpets
and
Pratice, Internstional edition, Prentice Hall.
Stoner, James A.F & Freeman, Edward R. 1992 Managemet, Fifth edition,
Precentice-Hall International edition.
Weihrich, Heinz & Koontz, Harold. 1994 Management: A Global Perspective, Tenth
Edition, McGRAWW HILL International edition.
Sugiyono. 2009. Metode Penelitian Kuantitatif Kualitatif dan R&D, Alfabeta :
Bandung
Mursyidi. 2008 Akuntansi : Conventional Costing, Just In Time, Activity Based
Costing, Cetakan Pertama, PT. Refika Aditama : Bandung
112
Rujukan Jurnal :
Ayu, Gusti . Perencanaan Waktu Pelaksanaan Proyek Dengan Metode PERT (Studi
Kasus Graha Miracle Makasar).
Muhamad, Rizki. Evaluasi Penjadwalan Waktu Dan Biaya Proyek Dengan Metode
CPM dan PERT (Studi Kasus Proyek Pembangunan Gedung Kantor Badan
Pusat Statistik Kota Medan).
Syarif, Dadang. Implementasi Critical Path Methods dan PERT Analysis pada proyek
Global Technology For Local Community. Jurnal Teknologi Dan Informasi
Dan Telematika Vol. 5, Desember 2012, 14 – 22.
Stelh, Peter. Analisis Proyek Menggunakan CPM (Critical Path Methods). Jurnal :
School of Doctoral Studies (European Union), Journal – July, 2009 No. 1.
Chatwal, Siddharth. Aplikasi Penjadwalan Proyek Menggunakan PERT Dan CPM
Technique. ISSN : 2278 – 6252 Vol. 3 No. 6 June 2014.
Ali, Goksu. Implementasi Critical Path Methods dan Project Evaluation and Review
Technique. 3rd International Symposium on Sustain Able Development, May
31 – June 01, 2012.
113
Rujukan Skripsi :
Iqbal Munir, Mochamad. 2012. Evaluasi Kinerja Proyek Recondition Fire Water
Pump P2226 JA Menggunakan Pendekatan Nilai HAsil Di PT. TAKA
TURBOMACHINERY Indonesia. Universitas Widyatama, Bandung.
Sumantri, Agus. 2002. Studi Tentang Perencanaan Waktu Dan Biaya Proyek
Penambahan Ruang Kelas Di Politeknik Manufaktur Pada PT. Haryang
Kuning. Universitas Widyatama. Bandung.
Pratiwi, Intan. 2007. Tinjauan Perencanaan Dan Pelaksanaan Proyek Pada Eltran
Indonesia. Universitas Widyatama.
Dannyanti, Eka. 2010. Optimalisasi Pelaksanaan Proyek Dengan Metode PERT Dan
CPM. Universitas Diponegoro. Semarang
114
Download