PORT INFORMATION OF “NORTH PULAU LAUT COAL TERMINAL“ NAME OF BERTH NORTH PULAU LAUT COAL TERMINAL (NPLCT) POSITION LAT 03 - 12' - 00" S LONG 116 - 17' - 00" E DEPTH BERTH 18.00 MTR L.A.T TURNING BASIN 18.00 MTR CHANNEL 14.00 MTR TIDAL RISE SPRING 2.80 MTR MHWS NEAP 2.00 MTR MHWS MEAN 1.40 MTR BERTH TYPE WHARF / DOLPHINS LENGTH 276 MTR (OVER MAIN BERTH) MAXIMUM PERMISSIBLE DRAFT 14.00 MTR + TIDE DIVIDE BY 1.10 UNDER KEEL CLEARANCE BERTH 1.00 MTR CHANNEL 10% OF DRAFT TURNING BASIN 1.00 MTR BALLAST CONDITION (EXC CAPE SIZE) FWD DRAFT 2% DRAFT OF LOA AFT DRAFT 3% OF LOA SHIPLOADER OUT REACH 29.4 MTR CLEAR HEIGHT (ABOVE HWL) 17.2 MTR (TOP OF HATCH COVER) LONG TRAVEL 210 MTR AVERAGE LOADING RATE 2,500 MT / HOUR MAXIMUM LOADING RATE 6,000 MT / HOUR (PEAK) STEVEDORE WORKING HOURS 24 HOURS PER DAY, 7 DAY PER WEEK, EXCEPT ON CHRISTMAS AND NEW YEAR HALF DAYS ONLY AND IDUL FITRI, IDUL ADHA 1 DAY HOLIDAY MAXIMUM ACCEPTABLE SIZE OF VESSEL LOA 320 MTR BEAM 47 MTR DRAFT 14.00 MTR + TIDE – UCK (10% DRAFT) DWT 150,000 DWT ALONG SIDE TYPE WHICH TO STARBOARD SIDE TUG BOAT ASSIT TB. IBT 36 2 X 1800 HP BOLLARDS PULL 40 TONS TB. IBT 32 2 X 1600 HP BOLLARDS PULL 40 TONS WATER DENSITY ABT 1,020 – 1,022 KG / LTR BUNKERING AND FRESH WATER NOT AVAILABLE AGENCY FULLSTYLE ADDRESS AND CONTACTS PT. Tenaga Baru Nuansa Persada, Palembang Branch Jl. Jepang Villa Gardena 3, Blok B No. 1, RT. 47 / RW. 11, KM 10, Kelurahan Karya Baru, Kecamatan Alang-Alang Lebar, Palembang, 30154. Tel: +62 711 742 3849 Fax: +62 711 742 3608 Email: [email protected] Mr. Ben Operation Manager Phone: +62 711 742 3849 Email: [email protected] Mr. Khairul Zaini Assistant Operation Manager Mob: +62 813 68887745 Email: [email protected]