Page 1 of 2 P2M - DEPARTEMEN TEKNIK MESIN, FAKULTAS TEKNIK UNIVERSITAS INDONESIA Gd. P2M - Dept. Teknik Mesin FTUI, Jl. Salemba Raya 4, Jakarta Pusat 10430 Telp./Fax : (021) 3149720, (021) 3144660. E-mail : [email protected]; www.p2mmesin.com Jadwal Pelatihan Periode : Januari s/d Desember 2017 1 2 3 4 5 6 7 8 9 Total Productive Maintenance ( TPM ) Pemeliharaan Mandiri (Autonomous Maintenance ) Perencanaan " Preventive Maintenance " Optimalisasi Pemeliharaan Preventif From PM to TPM (Dari Preventive Maintenance menuju Total Productive Maintenance) Pemeliharaan Berbasis Kehandalan ( RCM : Reliability Centered Maintenance ) Training Untuk Perencana Pemeliharaan ( Maintenance Planner Development ) Realibility : Dasar Perhitungan dan Analisa Risk Assessment and Management by Failure Mode & Effect Analysis ( FMEA ) 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 Teknik Perancangan Kontrol Listrik Konvensional & PLC (Programmable Logic Controller ) Perawatan dan Perancangan Sistem Pneumatik dan Hidrolik Electric Device : Principle and Application Perawatan dan Perancangan Poros & Bearing Perawatan Pengendalian Motor Listrik AC dan DC ( Electric Drive Maintenance ) Perawatan dan Perbaikan Motor Induksi 3 Phasa ( Maintenance & Repair ) Pemeliharaan Tools: Mesin, Listrik dan Instrument Sistem Pengukuran, Kalibrasi & Analisa Statistik (Caliper,Height&Dial Gauge, Verner) Alat Penukar Kalor (Heat Exchanger ): Desain, Operasi dan Pemeliharaan Oil Analysis and Tribology Basic Electronics Teknik Pemeliaraan Pompa (Perencanaan, Instalasi, Operasi & Pemeliharaan ) Rewinder Electric Motor Partial Discharger Training Managing Failure by Root Cause and Failure Analysis ( RCFA ) Operasi dan Pemeliharaan Kompresor Instrument dan Kelistrikan Vibration Analysis & Predictive Maintenance Sistem Instalasi dan Proteksi Jaringan Listrik Pemeliharaan Peralatan Pabrik (Pompa, Hidrolik, Motor Listrik, Bearing,Pelumasan ) Sistem Suspensi dan Roda Kendaraan ( Vehicle Suspension and Tire System ) Sistem Penggerak Kendaraan ( Vehicle Drivetrain System ) Electronic Technology ( Principle and Application ) Desain, Operasi dan Pemeliharaan Instalasi Listrik Pada Industri Operasi dan Pemeliharaan Panel Listrik Teknik Pemeliharaan Genset Diesel Operasi dan Pemeliharaan Pembangkit Tenaga Uap ( Boiler dan Turbin Uap ) Operasi, Perawatan dan Instalasi UPS ( Uninterruptable Power System ) Electrical Hazards and Risk Electrical Instrument Operation and Maintenance Troubleshooting & Pemeliharaan Sistem Kelistrikan Gedung dan Industri Pengoperasian, Perawatan dan Pemeriksaan Instalasi Listrik Gedung Maintenance and Operation Emergency Power System Sistem Instrumentasi dan Proses Kontrol Lokasi Ka Pkt Jml Hari HOTEL P2M P2M P2M HOTEL P2M P2M P2M HOTEL P2M WJT P2M WJT P2M P2M WJT YW WJT 3 2 3 3 3 3 3 2 3 6,900,000 4,700,000 5,600,000 5,600,000 6,900,000 5,600,000 5,600,000 4,700,000 6,900,000 P2M P2M P2M P2M P2M P2M P2M P2M P2M P2M P2M P2M P2M P2M P2M P2M P2M P2M P2M P2M P2M P2M P2M P2M P2M P2M P2M P2M P2M P2M P2M P2M P2M P2M DA YAN IH YAN DA IH IH P2M NS P2M IH YSN IH P2M GK P2M IH P2M DA P2M MA MA IH ARU IH P2M ASS DA/KUS DA/KUS DA/KUS DA/KUS DA/KUS DA/KUS DA/KUS 5 3 4 3 4 4 3 3 3 3 4 3 4 3 5 3 4 3 3 5 3 3 4 3 3 5 4 3 3 3 4 3 3 4 7,900,000 5,600,000 7,100,000 5,600,000 7,400,000 7,100,000 6,100,000 5,600,000 5,600,000 5,600,000 7,100,000 5,600,000 7,200,000 5,600,000 7,900,000 5,600,000 7,100,000 5,600,000 6,000,000 7,900,000 5,600,000 5,600,000 7,100,000 5,600,000 6,000,000 8,200,000 7,100,000 6,000,000 6,000,000 6,000,000 7,400,000 6,000,000 6,000,000 7,400,000 Biaya Tanggal Pelaksanaan JAN MAR APR 6-8 13 - 14 20 - 22 27 Feb - 1 Mar 17-19 26-27 6-8 13 - 14 20 - 22 FEB MAR 16-20 23-25 30 Jan - 2 Feb 20-24 6-8 13 - 16 20 - 23 27 Feb -1 Mrt 16-19 23-25 30 Jan - 2 Feb APR JULI AGUST MEI 3-5 10-12 17-18 24-26 JUNI JULI OKT 3-7 3-5 10-12 17-20 26-28 3-5 15-19 15-18 22-24 4-6 11 - 12 18 - 20 2-3 9 - 11 AGUST SEPT OKT NOV DES 6-10 13-15 20-23 27-29 4-7 11-14 18-20 25-27 4-7 11-14 18-20 2-4 9-11 16-19 23-25 30 Okt-2 Nov 6-8 13-17 20-22 27-30 7-9 21-24 21-23 28-30 3-7 3-5 10-12 17-20 24-26 31 Juli - 2 Agt 31 Juli - 4 Agt 7-10 28-30 3-5 10-12 17-20 24-26 31 Juli - 2 Agt 7 - 10 DES 13-15 20-22 27-29 4-6 11 - 13 3-6 10-12 17-20 24-26 31 Juli - 4 Agt 15-18 22-24 NOV 16-18 19-20 23-25 7 - 11 14 - 16 21 - 24 28 - 30 3-5 10-13 17-19 17-21 26-28 3-5 10-12 10-13 SEPT 7-9 14-16 28-30 2-5 15-18 22-24 22-24 6-8 13-15 16-18 23-25 30 Jan - 2 Feb 6-8 13-15 13-17 20-23 27 Feb -1 Mrt 6-8 13-15 20-23 JUNI 24-26 27-28 3-5 10-13 17-19 6-8 13 - 15 20 - 22 20-23 6-8 13-17 20-22 27 Feb -2 Mrt MEI 3-5 8 - 10 15-17 22-24 3-5 8-9 15-17 6-8 13-15 JAN Page 1 of 2 FEB 4-6 11-13 18 -22 11-15 18-20 25-27 4-6 11-13 2-5 9-11 16-18 30 Okt-3 Nov 6-9 13-15 20-22 27-30 25-27 9 - 11 23-26 4 -6 11-13 18-21 Lokasi 44 45 46 47 48 49 50 51 Penerapan K3 ( Kesehatan dan Keselamatan Kerja) di Industri Production Planning & Inventory Control ( PPIC ) Design of Experiment ( DOE ) Teknik Quality Control and Quality Assurance ( QC & QA ) Industrial Energy Audit Estimasi Biaya Manufaktur Successful Project Management Manajemen Pergudangan : Efisiensi Tata Letak Page 2Jml of 2 Ka Hari Pkt Biaya Tanggal Pelaksanaan JAN Operasi dan Pemeliharaan AC ( Tata Udara ) Energy Efficiency for Green Building Design HVAC Duct Design Energy Audit for New and Existing Building Design System Plumbing ( Perancangan Sistem Plambing ) Pemeliharaan Chiller Pengenalan Instalasi Mekanikal dan Elektrikal Dalam Gedung Manajemen Energi dan Tenaga Listrik Pada Real Estate/Bangunan Komersial & Industri ) Sistem Pengendalian Bahaya Kebakaran (Fire Protection System ) Basic Air Conditioning System Design ( Dasar Perancangan Sistem Tataudara ) Perencanaan dan Perancangan Sistem Listrik Pada Bangunan dan Industri Operasi dan Pemeliharaan Lift dan Escalator Perencanaan dan Perancangan Sistem Ducting ( SMACNA ) Teknologi dan Engineering Pemipaan Sistem Penangkal Petir Untuk Peralatan di Dalam Bangunan PROGGRAM PROFESI : 1. BUILDING MAINTENANCE APR MEI JUNI JULI AGUST OKT NOV DES YSN 3 5,600,000 6-8 11-13 13-15 YSN 3 6,900,000 20-22 10-12 18-20 20-22 P2M ISD 2 4,700,000 29-30 20-21 18-19 23-24 P2M P2M 3 5,600,000 16-18 3-5 25-27 P2M NSD 5 7,900,000 17-21 P2M P2M 3 5,600,000 23-27 30 Jan - 1 Feb 24-26 31 Juli - 4 Agt 17-19 7-9 9-11 4-6 P2M TPS 3 5,600,000 6-8 26-28 7-9 16-18 11-13 P2M P2M 3 5,600,000 13-15 21-23 23-25 18-20 HOTEL HOTEL HOTEL DW DW DW 3 3 3 6,900,000 6,900,000 6,900,000 '23-25 P2M BDH 5 7,900,000 P2M NSD 5 7,900,000 23-27 30 Jan - 3 Feb P2M BDH 3 5,600,000 6-8 P2M NSD 5 7,900,000 13-17 P2M RM 5 7,900,000 P2M RM 3 5,600,000 20-24 27 Feb-1 Mrt P2M P2M 5 7,900,000 P2M RM 3 5,600,000 P2M BDH 3 5,600,000 P2M BDH 10 11,000,000 P2M RM 5 7,900,000 30 Jan - 3 Feb P2M RM 3 5,600,000 P2M BDH 3 P2M P2M P2M RM 2. BUILDING MANAGEMENT FEB 3-5 MAR APR MEI JUNI 3-5 17-19 6-8 20-22 FEB 22-24 SEPT P2M JAN 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 MAR HOTEL JAN 52 Negotiation Skills 53 Team Building 54 Communication Skills FEB JULI APR MEI 3-7 OKT JUNI JULI 4-8 NOV 6-8 13-15 AGUST SEPT OKT NOV 4-8 13-17 17-21 3-7 11-15 20-24 17-19 10-12 18-20 4-6 17-21 17-21 25-29 11-15 15-19 8-10 24-28 31 Juli-2 Agt 7-11 21-23 29-31 3-5 2-6 18-22 9-11 30 Okt-3 Nov 18-20 6-8 28-30 6-17 13-15 4-15 13-24 3-7 4-8 20-24 6-8 17-19 10-12 11-13 27-29 5,600,000 13-15 26-28 17-19 18-20 2 4,800,000 8-9 20-21 28-29 3 5,600,000 20-21 27 Feb-1 Mrt 15-17 24-26 4. WELDING INSPECTOR Pelaksanaan Pelatihan Pukul : 09.00 s/d 16.30 WIB. File : d:/Schedule/sc-jan-des 2017 ctk.xls Update : 24/11/2016 Keterangan : 1 Selain program reguler kami juga menyediakan topik-topik pelatihan yang diselenggarakan bila ada permintaan ( by reguest ) baik secara reguler maupun In-house training. 2 Tempat pelatihan di P2M - Departemen Teknik Mesin FTUI JL. Salemba Raya 4, Jakarta ( min. 4 - 5 orang ), Hotel ( min. 6 orang ) 3 Biaya (Rp.000) tidak termasuk Pajak ( PPn & PPh ), Akomodasi dan Transportasi 4 Waktu Penyelenggaraan : 09.00 - 16.30 WIB 5 Biaya tsb termasuk : Materi, Lunch, coffe break 2x, Training kit dan Sertifikat Page 2 of 2 DES 3-7 3-7 3. MEKANIK OTOMOTIF DES 30 Okt-1 Nov 7-9 20-24 23-25 SEPT 17-19 24-26 8-10 MAR AGUST 27-29 2-6 4-6 7-8 2-4 5. PELATIHAN LAS / WELDING 18-20