LAPORAN PELAKSANAAN ANGGARAN PAKET KONTRAKTUAL (REGULER) PER PAKET PEKERJAAN
DI LINGKUNGAN BADAN PEMBINAAN KONSTRUKSI
TAHUN ANGGARAN 2011
STATUS 07 September 2011
dalam ribuan
KODE
13279856
1
2
3
4
5
6
13613586
7
8
9
10
11
12
13
14
13613612
15
13613633
16
13622280
17
18
19
20
21
22
23
24
-
TOTAL
6.544.274
736.703
728.915
717.893
741.983
2.890.888
727.892
5.016.008
600.000
600.000
600.000
600.000
600.000
600.000
700.000
716.008
174.598
174.598
829.195
829.195
22.536.451
250.000
250.000
3.095.000
605.000
571.451
1.900.000
365.000
-
741.983
2.890.888
727.892
5.016.008
600.000
600.000
600.000
600.000
600.000
600.000
700.000
716.008
174.598
174.598
829.195
829.195
22.536.451
250.000
250.000
3.095.000
605.000
571.451
1.900.000
365.000
1.200.000
-
1.200.000
1
1.200.000
-
1.200.000
1
1.200.000
-
1.200.000
1
1.600.000
-
1.600.000
1
1.600.000
-
1.600.000
1
1.600.000
-
1.600.000
1
1.600.000
-
1.600.000
1
1.600.000
-
1.600.000
1
1
1.600.000
300.000
-
1.600.000
300.000
1
1.000.000
-
1.000.000
1
3
1
1
1
10
1
1
1
1
1
1
1
1
1
1
3
1
1
1
1.000.000
3.150.000
850.000
600.000
1.700.000
896.454
57.150
179.089
71.280
88.200
86.735
60.000
86.500
75.000
120.000
72.500
946.674
255.000
302.100
389.574
-
1.000.000
3.150.000
850.000
600.000
1.700.000
896.454
57.150
179.089
71.280
88.200
86.735
60.000
86.500
75.000
120.000
72.500
946.674
255.000
302.100
389.574
SATKER/PAKET PEKERJAAN
PKT
PUSAT PEMBINAAN USAHA DAN KELEMBAGAAN
6
kajian Akses Pemanfaatan dan Pembuatan Database Peralatan dan Material Konstruksi,
1
Kajian Alih Pengetahuan (Transfer of Knowledge) Manajemen dari BUJK Asing ke BUJK Lokal
1
Kajian Peningkatan Akses Dan Pemanfaatan Modal Usaha Jasa Konstruksi
1
Kajian Rencana Implementasi Pengembangan Usaha dan Peningkatan Rasio Perbandingan Antara Badan
Usaha Spesialis dan Badan Usaha Umum
1
Pemantauan, Evaluasi, Dan Peningkatan Tertib Penerbitan Ijin Usaha Jasa Konstruksi û Tahap 2
1
Studi Penjaminan Bidang Jasa Konstruksi
1
PUSAT PEMBINAAN SUMBER DAYA INVESTASI
8
Kajian Kebutuhan dan Ketersediaan Material dan Peralatan Konstruksi
1
Kajian Kriteria Biaya Recovery dan Kelayakan Investasi Infastruktur
1
Kajian Pengukuran Indeks dan Kinerja Investasi Infrastruktur
1
Kajian Peningkatan Daya Saing Industri Konstruksi Nasional
1
Kajian Penyusunan Kerangka Pengelolaan Resiko Investasi Infrastruktur
1
Kajian Penyusunan Road Map Pembinaan Sumber Daya Investasi
1
1
Pengadaan Kendaraan Roda 4
1
Renovasi Gedung Kantor Pusbin SDI
PUSAT PEMBINAAN PENYELENGGARAAN KONSTRUKSI
1
PENGADAAN MEUBELAIR
1
BALAI PELATIHAN KONSTRUKSI WILAYAH III SURABAYA
1
PENGADAAN ALAT PENDIDIKAN DAN KETRAMPILAN TEKNIK KERJA TUKANG KAYU
1
PUSAT PEMBINAAN KOMPETENSI DAN PELATIHAN KONSTRUKSI
19
KAJIAN MANFAAT TENAGA KERJA KONSTRUKSI BERSERTIFIKAT PADA BADAN USAHA KONSTRUKSI
1
KAJIAN PENGEMBANGAN PEMBINAAN INSTRUKTUR DAN ASESOR JASA KONSTRUKSI
1
PEMBANGUNAN GEDUNG WORKSHOP DI ACEH
1
PEMBUATAN AUDIO VISUAL MATERI PELATIHAN BIDANG KONSTRUKSI
1
PENGADAAN GONDOLA
1
PENGADAAN GRADER
1
PENGEMBANGAN DATABASE MODUL PELATIHAN
1
PENYUSUNAN MATERI PELATIHAN BERBASIS KOMPETENSI 4 (EMPAT) JABATAN KERJA AHLI PERENCANA
PONDASI, AHLI PERENCANA PENGELOLA SAMPAH, MANAJER KONTRAKTOR KECIL & MENENGAH, DAN
MEKANIK ENGINE TINGKAT DASAR
1
RPM
6.544.274
736.703
728.915
717.893
Pagu
PLN
25
PENYUSUNAN MODUL DAN KURIKULUM PELAKSANA LAPANGAN PEKERJAAN JALAN BETON, PELAKSANA
LAPANGAN PEKERJAAN PERPIPAAN, PELAKSANA LAPANGAN PEKERJAAN BANGUNAN LIMBAH
PERMUKIMAN, PELAKSANA LAPANGAN PEKERJAAN PENANGGANAN PANTAI
PENYUSUNAN MODUL DAN KURIKULUM PELATIHAN TUKANG PASANG UBIN, TUKANG PASANG BATU
26
BATA, TUKANG TAMAN PADA BANGUNAN GEDUNG, PEMASANG DINDING PARTISI
PENYUSUNAN SKKNI AHLI PEMERIKSA KELAIKAN STRUKTUR BANGUNAN GEDUNG, AHLI PEMERIKSA
27
KELAIKAN MEKANIKAL BANGUNAN GEDUNG, AHLI PEMERIKSA KELAIKAN ELEKTRIKAL BANGUNAN
GEDUNG, MANAJER ALAT BERAT
PENYUSUNAN SKKNI ESTIMATOR BIAYA JALAN, QUALITY ASSURANCE ENGINEER, MANAJER LOGISTIK
28
PROYEK KONSTRUKSI, MANAJER TEHNIK JALAN REL
PENYUSUNAN SKKNI OPERATOR MESIN PENCAMPUR ASPAL, OPERATOR MESIN PENGGELAR ASPAL,
29
OPERATOR CONCRETE DUMP EQUIPMENT, PELAKSANA PRODUKSI HOTMIX
PENYUSUNAN SKKNI PELAKSANA LAPANGAN PEKERJAAN DRAINASE PERKOTAAN, PELAKSANA
30
LAPANGAN PEKRJAAN REL, TEKNISI LABORATORIUM ASPAL, MANDOR PERKERASAN JALAN
PENYUSUNAN SKKNI PERENCANA PERATURAN ZONASI, PERANCANG RUANG TERBUKA HIJAU, INTERIOR,
31
ILUMINASI
PENYUSUNAN SKKNI TUKANG PASANG RANGKA ATAP BAJA RINGAN, PELAKSANA LAPANGAN PEKERJAAN
32
BRONJONG, PELAKSANA SALURAN IRIGASI, TUKANG PASANG WATERPROOFING
Perencanaan SDM Pusbin KPK
33
REVIEW MODUL DAN KURIKULUM PELATIHAN JURU UKUR, JURU GAMBAR ARSITEKTUR, JURU UKUR
34
KUANTITAS BANGUNAN GEDUNG, PELAKSANA LAPANGAN SALURAN IRIGASI
REVIEW MODUL DAN KURIKULUM PELATIHAN MANDOR TUKANG BATU, MANDOR TUKANG KAYU,
35
MANDOR PEKERJAAN TANAH, TUKANG BANGUNAN UMUM
13630891 SEKRETARIAT BADAN PEMBINAAN KONSTRUKSI
36
Implementasi & Penyusunan Indek Konstruksi Nasional & Provinsi
37
Penyusunan Konsep T & D SDM BP-Konstruksi
38
Rehablitasi Mess Balai Pelatihan Konstruksi dan Peralatan Wilayah II
13647973 BALAI PELATIHAN KONSTRUKSI WILAYAH I BANDA ACEH
39
Pemasangan Daya Listrik 66000 VA pada Balai PKW-I Banda Aceh
40
Pembangunan Gardu Distribusi 160 KVA Balai PKW-I Banda Aceh
41
Pengadaan Kursi dan Meja Belajar
42
Pengadaan Lemari Arsip, Meja dan Kursi Rapat dan Tamu
43
Pengadaan Meja dan Kursi Kerja
44
Pengadaan Notebook
45
Pengadaan Peralatan Pelatihan
46
Pengadaan Peralatan Praktek Pelatihan
47
Pengadaan Personal Computer (PC)
48
Pengadaan/Pembelian AC
13647980 BALAI PELATIHAN KONSTRUKSI WILAYAH IV BANJARMASIN
49
Pembangunan Pagar Tembok
50
Pengadaan Peralatan Batu
51
Pengadaan Peralatan Kayu
LAPORAN PELAKSANAAN ANGGARAN PAKET KONTRAKTUAL (REGULER) PER PAKET PEKERJAAN
DI LINGKUNGAN BADAN PEMBINAAN KONSTRUKSI
TAHUN ANGGARAN 2011
STATUS 07 September 2011
13647994
52
53
54
55
56
57
58
13648009
59
60
61
62
63
13648013
BALAI PELATIHAN KONSTRUKSI WILAYAH V MAKASAR
PENGADAAN ALAT PENGOLAH DATA
PENGADAAN ALAT STUDIO
PENGADAAN MEUBELAIR
PENGADAAN PRASANA KELAS DAN KANTOR
PENGADAAN SARANA DAN PRASARANA
PENGEMBANGAN SARANA DAN PRASARANA KEDIKLATAN
Perencanaan pembangunan Gedung Workshop
BALAI PELATIHAN KONSTRUKSI DAN PERALATAN WILAYAH II JAKARTA
PENGADAAN BULLDOZER
PENGADAAN PEMASANGAN PANEL LISTRIK
PENGADAAN VIBRO ROLLER
REHABILITASI BANGUNAN WORKSHOP
REHABILITASI FASADE GEDUNG KANTOR
KESEKRETARIATAN LPJK
Kajian Kesiapan Badan Usaha (BUJK) Dalam Melaksanakan Konstruksi Berkelanjutan (Sustainable
64
Construction)
Kajian Perancangan Konsep Pengembangan Usaha Berkelanjutan Untuk Pembinaan Asosiasi Badan
65
Usaha Konstruksi Menggunakan Konsep Continuous Profesional Development (CPD)
13648020 BALAI PELATIHAN KONSTRUKSI WILAYAH VI JAYAPURA
66
PEMBUATAN PAGAR WORKSHOP
67
PENGADAAN PERALATAN PENGOLAH DATA DAN SOUND SYSTEM
PENGADAAN PERALATAN UNTUK PENGEMBANGAN SARANA DAN PRASARANA KEDIKLATAN BALAI
68
PELATIHAN KONSTRUKSI WILAYAH VI
TOTAL
7
1
1
1
1
1
1
1
5
1
1
1
1
1
2
4.762.489
161.000
120.000
196.700
143.750
2.741.039
1.000.000
400.000
4.954.417
1.500.000
275.000
720.000
1.128.117
1.331.300
1.474.583
-
dalam ribuan
4.762.489
161.000
120.000
196.700
143.750
2.741.039
1.000.000
400.000
4.954.417
1.500.000
275.000
720.000
1.128.117
1.331.300
1.474.583
1
736.659
-
736.659
1
3
1
1
737.924
3.868.701
300.000
325.000
-
737.924
3.868.701
300.000
325.000
1
68
3.243.701
55.153.844
-
3.243.701
55.153.844