pertemuan13 - iLearning.me

advertisement
PROJECT MANAGEMENT
MUTU
PROYEK SISTEM
SESI : 13
BY
ARISM,SKOM,MMSI.
MANPRO-M13: MUTU PROYEK
SISTEM
am/page : 1 of 17
PROJECT MANAGEMENT
Tujuan dari Matriks Software
 Pengukuran yang akurat dan tepat waktu
 Menilai kualitas proyek secara keseluruhan
 Sebagai dasar untuk estimasi biaya dan jadwal
penyelesaian proyek secara akurat
MANPRO-M13: MUTU PROYEK
SISTEM
am/page : 2 of 17
PROJECT MANAGEMENT
Sistem Perangkat Lunak SI Yang Sukses, Proses Dari Awal
Sampai Proses Akhir Terdefinisi (Dibuat) Dengan
Sempurna.
 Tangguh
 Kinerja baik
 Selesai dengan sempurna
MANPRO-M13: MUTU PROYEK
SISTEM
am/page : 3 of 17
PROJECT MANAGEMENT
Pembuatan Software Secara Modern Mencakup :
 Perencanaan, dapat mengakomodasi kebutuhan dan
arsitektur yang terus berkembang
 Penanganan manajemen resiko, dan pengukuran
progres dan kualitas secara objektif
 Kemampuan sistem yang terus dikembangkan melalui
peningkatan fungsi-fungsi
MANPRO-M13: MUTU PROYEK
SISTEM
am/page : 4 of 17
PROJECT MANAGEMENT
Tujuh Matriks Inti
Indikator Manajemen
1) Pekerjaan dan kemajuan (kinerja)
2) Biaya dan pengeluaran
3) Penugasan dan tim dinamik (perubahan personel)
Indikator Kualitas
4) Perubahan kebijakan dan stabilitas
5) Kerusakan dan modularity
6) Rework dan adabtability
7) Mean time between failure(MTBF)
 defect rate
MANPRO-M13: MUTU PROYEK
SISTEM
am/page : 5 of 17
PROJECT MANAGEMENT
Iterative Development: Pengelolaan Perubahan Dan
Mengukur Perubahan
Aspek Yang Paling Penting Dalam Matriks
MANPRO-M13: MUTU PROYEK
SISTEM
am/page : 6 of 17
PROJECT MANAGEMENT
Gambar Iterative
Process
Planning and
analysis
Design
Assessment
Implementation
MANPRO-M13: MUTU PROYEK
SISTEM
am/page : 7 of 17
PROJECT MANAGEMENT
The phases of the life-cycle process
Engineering Stage
Inception
Idea
Production Stage
Elaboration
Architecture
Construction
Beta Release
MANPRO-M13: MUTU PROYEK
SISTEM
Transition
Product
am/page : 8 of 17
PROJECT MANAGEMENT
Proses Workflow
1.
2.
3.
4.
5.
6.
7.
Aktivitas-aktivitas dari proses pembuatan perangkat lunak
dibagi kedalam 7 workflow utama sbb:
Management
Environment
Requirement
Design
Implementation
Assessment
Deployment
MANPRO-M13: MUTU PROYEK
SISTEM
am/page : 9 of 17
PROJECT MANAGEMENT
Tujuh Level Workflow
1.
2.
3.
4.
5.
6.
7.
Management workflow: controlling the process and ensuring win
condition for all stakeholder
Environment workflow: automating the process and evolving the
maintenance environment
Requirement workflow: analyzing the problem space and evolving the
requirements artifacts
Design workflow: modeling the solution and evolving the architecture
and design artifacts
Implementation workflow: programming the components and evolving
the implementation and deployment artifacts
Assessment workflow: assessing the trends in process and product
quality
Deployment workflow: transition the end products to the user
MANPRO-M13: MUTU PROYEK
SISTEM
am/page : 10 of 17
PROJECT MANAGEMENT
Inception
Elaboration
Construction
Transition
Management
Environment
Requirements
Design
Implementation
Assessment
Deployment
Actifity levels across the life-cycle phase
MANPRO-M13: MUTU PROYEK
SISTEM
am/page : 11 of 17
Allocated
Usage scenarios
Result from MANAGEMENT
the
PROJECT
• Up-to-date risk assessment
previous iteration
• Controlled baselines of artifacts
• Demonstrable results
Management
- Requirements understanding
Requirements
- Design features/performance
Design
- Plan credibility
Implementation
Assessment
Deployment
Result for the
next iteration
The workflow of an iteration
MANPRO-M13: MUTU PROYEK
SISTEM
am/page : 12 of 17
PROJECT MANAGEMENT
Iteration emphasis across the life cycle
Management
Requirements
Design
Implementation
Assessment
Deployment
Inception and Elaboration Phase
MANPRO-M13: MUTU PROYEK
SISTEM
am/page : 13 of 17
PROJECT MANAGEMENT
Iteration emphasis across the life cycle
Management
Requirements
Design
Implementation
Assessment
Deployment
Construction Phase
MANPRO-M13: MUTU PROYEK
SISTEM
am/page : 14 of 17
PROJECT MANAGEMENT
Iteration emphasis across the life cycle
Management
Requirements
Design
Implementation
Assessment
Deployment
Transition Phase
MANPRO-M13: MUTU PROYEK
SISTEM
am/page : 15 of 17
PROJECT MANAGEMENT
Integrasi yang Terus-Menerus

Iterative development (design arsitektur pertama-tama
dilakukan)

Verifikasi aktivitas pada phase design, sehingga dapat
dideteksi dan solusi terhadap permasalahan lebih
cepat

Menghindari “big-bang integration” pada akhir masa
pembuatan proyek
MANPRO-M13: MUTU PROYEK
SISTEM
am/page : 16 of 17
PROJECT MANAGEMENT
PERSIAPAN PRESENTASI
PROPOSAL PROYEK SISTEM
TUGAS MANDIRI 1
PADA PERTEMUAN KE 14
MANPRO-M13: MUTU PROYEK
SISTEM
am/page : 17 of 17
Download