Berdasar jenis pembangkit, PLTU batubara akan

advertisement
Tentang ABM
About ABM
Dari Manajemen
From the Management
Diskusi dan Analisis Manajemen
Management Discussion and Analysis
Penunjang Bisnis
Business Support
Tata Kelola Perusahaan
Corporate Governance
Tanggung Jawab Sosial Perusahaan
Corporate Social Responsibility
Data Perusahaan
Corporate Data
Laporan Keuangan Konsolidasi
Consolidated Financial Statements
12.000
PLN
67
1.869
Uncallocated
10.000
1.506
IPP
55
6.410
ABM Investama Annual Report 2013
8.000
90
3.948
2.013
6.000
1.244
2.919
2.003
1.535
2.908
4.000
2.518
2.003
2.013
729
1.026
2.000
878
0
314
-
-
2013
2014
729
3.435 1.391 3.274
2.084 2.689
1.954
96
96
2015
2016 2017
2018
2019
2020 2021 2022
Gambar 8: Rencana kebutuhan kapasitas pembangkit
Figure 8: power plant capacity demand forecast
(Sumber/Source: RUTPL 2013-2022)
Berdasar jenis pembangkit, PLTU batubara akan mendominasi
jenis pembangkit yang akan dibangun, yaitu mencapai 37,9 GW
atau 63,8%. PLTGU (Pembangkit Listrik Tenaga Gas-Uap) yang
direncanakan berkapasitas 5 GW atau 8,4%, energi terbarukan
sebesar 6,5 GW atau 11,0% yang sebagian besar adalah
PLTA (Pembangkit Listrik Tenaga Air), dan 6,0 GW atau 10,2%
adalah panas bumi (PLTP). Dari kapasitas tersebut, tambahan
pembangkit di Indonesia Bagian Barat adalah sekitar 16,6 GW
dan di Indonesia Bagian Timur adalah sekitar 11,5 GW. Untuk
sistem Jawa – Bali, tambahan pembangkit adalah sekitar 31,5
GW atau rata-rata 3,2 GW per tahun, termasuk Pembangkit
Listrik Mini Hidro (PLTM) skala kecil tersebar sebanyak 353 MW
dan Pembangkit Listrik Tenaga Bayu 50 MW.
By type of plants, the coal-fired power plant will dominate the
type of plants to be built, reaching upto 37.9 GW, or 63.8%.
Gas-Steam Power Plants are planned to have capacity of 5 GW
or 8.4%, renewable energy of 6.5 GW or 11.0% which is mostly
hydroelectric (hydro power plants), and 6.0 GW or 10.2% are
geothermal (PLTP). Of the capacities, additional power plants in
Western Indonesia are about 16.6 GW in Eastern Indonesia are
around 11.5 GW. For Java - Bali system, additional power plants
are about 31.5 GW, or an average of 3.2 GW per year, including
distributed small scaled Mini Hydro Power Plants (PLTM) of 353
MW and Wind Power Plant of 50 MW.
Rencana pembangunan pembangkit listrik berdasarkan jenis
pembangkit setiap tahunnya ditunjukkan pada gambar 9:
The annual power plant installation plan by the type of plant is
shown in Figure 9:
12.000
9.590 9.790
10.000
7.523
8.000
6.986
6.000
5.410 5.364
5.062
3.900
4.000
3.032
2.891
2.000
0
2013
PLTU
PLTA
2014
PLTP
2015
2016 2017
PLTGU
2018
2019
PLTG
2020 2021 2022
PL Lain
Gambar 9: Rencana kebutuhan berdasarkan jenis pembangkit
Figure 9: Demand forecast by the type of power plant
(Sumber/Source: RUTPL 2013-2022)
Total
Download