DAILY REPORT SI PLUS UNIT 1 PLTU BARRU
PLTU BARRU OMU
Project Daily Progress
8-Mar-21
Planning
100.00%
Realisasi
98.54%
Gap
-1.46%
TARGET
REALISASI
100.00%
Projected Monthly Income label is in cell at right. Enter Income 1 in cell C5 and Extra Income in C6 to
calculate Total monthly income in C7. Next instruction is in cell A7.
95.00%
90.00%
85.00%
80.00%
75.00%
70.00%
100.50%
65.00% is in cell A9.
Projected Balance is auto calculated in cell H4, Actual Balance in H6, and Difference in H8. Next instruction
60.00%
100.00%
55.00%
50.00%
Kondisi K3 dan Lingkungan
Hari ke-51
99.50%
45.00%
Actual Monthly Income label is in cell at right. Enter Income 1 in cell C10 and Extra Income in C11 to 40.00%
calculate Total monthly income in C12. Next instruction is in cell A14.
99.00%
35.00%
- Kondisi personel mitra sehat
30.00%
98.50%
25.00%
- Skema Isoma dimasing-masing shelter dan mess pekerja
98.00%
20.00%
15.00%
- Pengukuran suhu tubuh di POS 1 PLTU Barru
97.50%
10.00%
0.00%
98.52%
17-Jan-21
18-Jan-21
19-Jan-21
20-Jan-21
21-Jan-21
22-Jan-21
23-Jan-21
24-Jan-21
25-Jan-21
26-Jan-21
27-Jan-21
28-Jan-21
29-Jan-21
30-Jan-21
31-Jan-21
1-Feb-21
2-Feb-21
3-Feb-21
4-Feb-21
5-Feb-21
6-Feb-21
7-Feb-21
8-Feb-21
9-Feb-21
10-Feb-21
11-Feb-21
12-Feb-21
13-Feb-21
14-Feb-21
15-Feb-21
16-Feb-21
17-Feb-21
18-Feb-21
19-Feb-21
20-Feb-21
21-Feb-21
22-Feb-21
23-Feb-21
24-Feb-21
25-Feb-21
26-Feb-21
27-Feb-21
28-Feb-21
1-Mar-21
2-Mar-21
3-Mar-21
4-Mar-21
5-Mar-21
6-Mar-21
7-Mar-21
8-Mar-21
9-Mar-21
10-Mar-21
11-Mar-21
12-Mar-21
13-Mar-21
14-Mar-21
15-Mar-21
16-Mar-21
17-Mar-21
- Cuaca Hujan
100.00%
TARGET VS REALISASI
5.00%
Note
Standard Scope freeze sampai boiler ready pengetesan
REALISASI HARI INI
TARGET
ACTUAL
DIFFERENCE
RENCANA PEKERJAAN BESOK
REFRACTORY DRY OUT
10%
14%
4%
REFRACTORY DRY OUT
25.00%
STANDARD SCOPE MSU
99.68%
99.46%
-0.22%
STANDARD SCOPE MSU
99.68%
PERBAIKAN CWP 1 A
60.00%
80.35%
20.35%
PERBAIKAN CWP 1 A
66.67%
Enter details in Housing table starting in cell at right and in Entertainment table starting in cell G14. Next instruction is in cell A27.
DOKUMENTASI
RDO HEATING UP TO HOLD POINT 1
TARGET
INSTALASI CWP 1A
Page 2 of 2
SI PLUS UNIT 1 & MO UNIT 2
(17 Jan - 7 Mar 2021 & 17 Jan - 6 Feb 2021)
ID Task%
Task Name
Mode
Complete
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
99%
PIC
1 SI PLUS UNIT 1 PLTU BARRU OMU
Actual
Duration
Start
Duration
49.35 days 50.08 days
1/17/21
100%
1.1 SHUTDOWN
OP
1 hr
1 hr
100%
1.2 COOLING DOWN BOILER
OP
2 days
2 days 1/17/21
100%
1.3 TURNING GEAR OFF & CWP OFF
OP
5 days
5 days 1/17/21
98%
1.4 ADDITIONAL SCOPE SI+
HAR
42.17 days 42.95 days
1/17/21
100%
1.4.1 DRAIN MATERIAL BED
1/17/21
MITRA MSU 3 days
3 days 1/17/21
100%
1.4.1.1 Drain melalui Bottom Ash Cooler
2 days
2 days 1/17/21
100%
1.4.1.2 Buka Manhole Furnace
2 hrs
2 hrs
1/19/21
1 day
1 day
1/19/21
100%
100%
1.4.1.3 Cleaning sisa Material Bed
1.4.2 PEKERJAAN SCAFOLDING
MITRA BRU 41.5 days
41.5 days
1/18/21
100%
1.4.2.1 Pemasangan Scafolding Furnace
5 days
5 days 1/20/21
100%
1.4.2.2 Pemasangan Scafolding Cyclone Side A
2 days
2 days 1/21/21
100%
1.4.2.3 Pemasangan Scafolding Cyclone Side B
2 days
2 days 1/22/21
100%
1.4.2.4 Pemasangan Scafolding HRA
2 days
2 days 1/23/21
100%
1.4.2.5 Pemasangan Scafolding Valve Area Boiler
3 days
3 days 1/18/21
100%
1.4.2.6 Pemasangan scafolding area Condenser
3 days
3 days 1/18/21
100%
1.4.2.7 Pemasangan Scafolding Bush Duct Trafo
3 days
3 days 1/25/21
100%
1.4.2.8 Pemasangan Scafolding Valve Area Turbin
3 days
3 days 1/25/21
100%
1.4.2.9 Pembongkaran Scafolding Furnace
4 days
4 days 2/24/21
100%
1.4.2.10 Pembongkaran Scafolding Cyclone Side A
2 days
2 days 2/12/21
100%
1.4.2.11 Pembongkaran Scafolding Cyclone Side B
2 days
2 days 2/12/21
100%
1.4.2.12 Pembongkaran Scafolding HRA
2 days
2 days 2/12/21
100%
1.4.2.13 Pembongkaran Scafolding Valve Area Boiler
2 days
2 days 2/10/21
100%
1.4.2.14 Pembongkaran Scafolding Bush Duct Trafo
2 days
2 days 2/17/21
2 days
2 days 2/17/21
MSU,HAR,OP0 days
2 days 2/12/21
100%
1.4.2.15 Pembongkaran Scafolding Valve Area Turbin
0%
1.4.3 PENGETESAN FAN BOILER
0%
1.4.3.1 Pengetesan PAF
0 days
1 day
2/12/21
0%
1.4.3.2 Pengetesan SAF
0 days
1 day
2/13/21
16
21
26
February 2021
31
5
10
15
20
25
March 2021
2
7
SI PLUS UNIT 1 & MO UNIT 2
(17 Jan - 7 Mar 2021 & 17 Jan - 6 Feb 2021)
ID Task%
Task Name
Mode
Complete
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
PIC
Actual
Duration
Start
Duration
0%
1.4.3.3 Pengetesan HPFF A
0 days
1 day
2/12/21
0%
1.4.3.4 Pengetesan HPFF B
0 days
1 day
2/12/21
0%
1.4.3.5 Pengetesan HPFF C
0 days
1 day
2/12/21
0%
1.4.3.6 Pengetesan CDAF
0 days
1 day
2/13/21
0%
1.4.3.7 Pengetesan IDF A
0 days
1 day
2/12/21
0%
1.4.3.8 Pengetesan IDF B
0 days
1 day
2/13/21
100%
1.4.4 PEMBONGKARAN DAN PEMASANGAN NOZZLE
MITRA BRU 5.5 days
5.5 days2/14/21
100%
1.4.4.1 Pembongkaran 1167 Nozzle Boiler
1 day
1 day
100%
1.4.4.2 Pemasangan 1167 Nozzle Boiler
2 days
2 days 2/15/21
100%
1.4.4.3 Weld 1167 Nozzle Boiler
2 days
2 days 2/17/21
100%
1.4.4.4 Final Inspection
0.5 days
0.5 days2/19/21
0.5 days
0.5 days2/19/21
MSU Services12 days
12 days 2/14/21
100%
100%
100%
100%
1.4.4.5 Cleaning Area kerja
1.4.5 RLA BOILER
1.4.5.1 RLA Furnace
1.4.5.2 RLA Superheater, Economizer.
2/14/21
6 days
6 days 2/14/21
6 days
6 days 2/20/21
100%
1.4.6 RETUBBING PIPA BOILER
MITRA BRU 35 days
35 days 1/25/21
100%
1.4.7 CLEANING LINE CWP DAN APLIKASI FRP PIPA FRP CWP
MITRA BRU 16 days
16 days 1/22/21
100%
1.4.7.1 Persiapan Tools dan Material
1 day
1 day
1/22/21
100%
1.4.7.2 Membuka Manhole Venting Line CWP A dan B
1 day
1 day
1/23/21
100%
1.4.7.3 Pengurasan Air di Line CWP & Sirkulasi Udara di Line CWP
4 days
4 days 1/23/21
100%
1.4.7.4 Cleaning Line CWP
8 days
8 days 1/25/21
100%
1.4.7.5 Pemasangan Stop Block Inlet CWP 1 dan 2
2 days
2 days 1/26/21
100%
1.4.7.6 Cleaning Sumur CWP 1 - 2 dan Strainer
6 days
6 days 1/27/21
100%
1.4.7.7 Laminasi FRP pipa yang ditemukan Crack
8 days
8 days 1/27/21
100%
1.4.7.8 Joint inspection Pasca Cleaning & Repair
1 day
1 day
2/3/21
100%
1.4.7.9 Menutup Manhole Line CWP
1 day
1 day
2/4/21
100%
1.4.7.10 Cleaning Area Kerja
1 day
1 day
2/5/21
100%
1.4.7.11 Pengangkatan Stop Blok dan Pemasangan Screen CWP 1 dan 2
1 day
1 day
2/6/21
16
21
26
February 2021
31
5
10
15
20
25
March 2021
2
7
SI PLUS UNIT 1 & MO UNIT 2
(17 Jan - 7 Mar 2021 & 17 Jan - 6 Feb 2021)
ID Task%
Task Name
Mode
Complete
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
100%
100%
PIC
1.4.8 PURIFIKASI MINYAK TRAFO GT UAT DAN ESP
1.4.8.1 TRAFO GT
Actual
Duration
Start
Duration
MITRA BRU 10 days
10 days 1/27/21
4 days
4 days 1/27/21
100%
1.4.8.1.1 Persiapan Peralatan
1 day
1 day
1/27/21
100%
1.4.8.1.2 Pengambilan Sample Oli "Before"
1 day
1 day
1/27/21
100%
1.4.8.1.3 Pemasangan Hose dari Purifier ke Trafo
1 day
1 day
1/27/21
100%
1.4.8.1.4 Pengecekan Level oli Trafo & Penambahan Oli
1 day
1 day
1/27/21
100%
1.4.8.1.5 Purifikasi dan Pengambilan data
2 days
2 days 1/28/21
100%
1.4.8.1.6 Joint Inspection dan Cleaning Area Kerja
1 day
1 day
100%
4 days
4 days 1/30/21
100%
1.4.8.2.1 Pengambilan Sample Oli
1 day
1 day
1/30/21
100%
1.4.8.2.2 Pemasangan Hose dari Purifier ke Trafo
1 day
1 day
1/30/21
100%
1.4.8.2.3 Pengecekan Level oli Trafo & Penambahan Oli
1 day
1 day
1/30/21
100%
1.4.8.2.4 Purifikasi dan Pengambilan data
2 days
2 days 1/31/21
100%
1.4.8.2.5 Joint Inspection dan Cleaning Area Kerja
1 day
1 day
100%
1.4.8.2 TRAFO UAT
1/30/21
4 days
4 days 2/2/21
100%
1.4.8.3.1 Persiapan Peralatan
1 day
1 day
2/2/21
100%
1.4.8.3.2 Pengambilan Sample Oli
1 day
1 day
2/2/21
100%
1.4.8.3.3 Pemasangan Hose dari Purifier ke Trafo
1 day
1 day
2/2/21
100%
1.4.8.3.4 Pengecekan Level oli Trafo & Penambahan Oli
1 day
1 day
2/2/21
100%
1.4.8.3.5 Purifikasi dan Pengambilan data
2 days
2 days 2/3/21
100%
1.4.8.3.6 Joint Inspection dan Cleaning Area Kerja
1 day
1 day
100%
1.4.8.3 TRAFO ESP
2/2/21
1.4.9 REKONDISI PIPA GAC
MITRA BRU 8 days
2/5/21
8 days 1/23/21
100%
1.4.9.1 Persiapan peralatan
1 day
1 day
100%
1.4.9.2 Pemasangan Scafolding
2 days
2 days 1/24/21
1/23/21
100%
1.4.9.3 Wire Brush Pipa
1 day
1 day
100%
1.4.9.4 Laminasi FRP Pipa
4 days
4 days 1/26/21
100%
1.4.9.5 Painting
1 day
1 day
1/29/21
100%
1.4.9.6 Finishing
1 day
1 day
1/30/21
1/25/21
16
21
26
February 2021
31
5
10
15
20
25
March 2021
2
7
SI PLUS UNIT 1 & MO UNIT 2
(17 Jan - 7 Mar 2021 & 17 Jan - 6 Feb 2021)
ID Task%
Task Name
Mode
Complete
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
100%
1.4.9.7 Cleaning area kerja
100%
1.4.10 PERBAIKAN PONDASI HPFF
PIC
Actual
Duration
Start
Duration
1 day
MITRA BRU 15 days
1 day
1/30/21
15 days 1/19/21
100%
1.4.10.1 Persiapan Tools dan Material
1 day
1 day
1/19/21
100%
1.4.10.2 HPFF A_Pengangkatan Housing
1 day
1 day
1/20/21
100%
1.4.10.3 HPFF A_Melepas Power dan Koneksi pipa
1 day
1 day
1/20/21
100%
1.4.10.4 HPFF A_Mengangkat Motor, Fan dan Base Plate
1 day
1 day
1/20/21
100%
1.4.10.5 HPFF A_Pembuatan Base Plate Baru
3 days
3 days 1/21/21
100%
1.4.10.6 HPFF A_Membongkar Pondasi
1 day
1 day
1/21/21
100%
1.4.10.7 HPFF A_Pengecoran Pondasi Baru
1 day
1 day
1/22/21
100%
1.4.10.8 HPFF A_Pengeringan Pondasi
3 days
3 days 1/23/21
100%
1.4.10.9 HPFF A_Pemasangan Base Plat Baru
1 day
1 day
1/26/21
100%
1.4.10.10 HPFF A_Pemasangan Motor, Fan
1 day
1 day
1/26/21
100%
1.4.10.11 HPFF A_Alignment dan Pengetesan
1 day
1 day
1/26/21
100%
1.4.10.12 HPFF A_Pemasangan Housing
1 day
1 day
1/26/21
100%
1.4.10.13 HPFF B_Pengangkatan Housing
1 day
1 day
1/23/21
100%
1.4.10.14 HPFF B_Melepas Power dan Koneksi pipa
1 day
1 day
1/23/21
100%
1.4.10.15 HPFF B_Mengangkat Motor, Fan dan Base Plate
1 day
1 day
1/23/21
100%
1.4.10.16 HPFF B_Pembuatan Base Plate Baru
3 days
3 days 1/24/21
100%
1.4.10.17 HPFF B_Membongkar Pondasi
1 day
1 day
1/24/21
100%
1.4.10.18 HPFF B_Pengecoran Pondasi Baru
1 day
1 day
1/25/21
100%
1.4.10.19 HPFF B_Pengeringan Pondasi
3 days
3 days 1/26/21
100%
1.4.10.20 HPFF B_Pemasangan Base Plat Baru
1 day
1 day
1/29/21
100%
1.4.10.21 HPFF B_Pemasangan Motor, Fan
1 day
1 day
1/29/21
100%
1.4.10.22 HPFF B_Alignment dan Pengetesan
1 day
1 day
1/29/21
100%
1.4.10.23 HPFF B_Pemasangan Housing
1 day
1 day
1/29/21
100%
1.4.10.24 HPFF C_Pengangkatan Housing
1 day
1 day
1/26/21
100%
1.4.10.25 HPFF C_Melepas Power dan Koneksi pipa
1 day
1 day
1/26/21
100%
1.4.10.26 HPFF C_Mengangkat Motor, Fan dan Base Plate
1 day
1 day
1/26/21
16
21
26
February 2021
31
5
10
15
20
25
March 2021
2
7
SI PLUS UNIT 1 & MO UNIT 2
(17 Jan - 7 Mar 2021 & 17 Jan - 6 Feb 2021)
ID Task%
Task Name
Mode
Complete
PIC
Actual
Duration
Start
Duration
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
100%
1.4.10.27 HPFF C_Pembuatan Base Plate Baru
3 days
3 days 1/27/21
100%
1.4.10.28 HPFF C_Membongkar Pondasi
1 day
1 day
1/27/21
100%
1.4.10.29 HPFF C_Pengecoran Pondasi Baru
1 day
1 day
1/28/21
100%
1.4.10.30 HPFF C_Pengeringan Pondasi
3 days
3 days 1/29/21
100%
1.4.10.31 HPFF C_Pemasangan Base Plat Baru
1 day
1 day
2/1/21
100%
1.4.10.32 HPFF C_Pemasangan Motor, Fan
1 day
1 day
2/1/21
100%
1.4.10.33 HPFF C_Alignment dan Pengetesan
1 day
1 day
2/1/21
100%
1.4.10.34 HPFF C_Pemasangan Housing
1 day
1 day
2/1/21
1 day
1 day
2/2/21
139
100%
100%
1.4.10.35 Final Check dan Cleaning area kerja
100%
1.4.11 MODIFIKASI STRAINER MOT TURBIN
100%
1.4.11.1 Persiapan Peralatan & Material
1 day
1 day
1/19/21
100%
1.4.11.2 Pemasangan scafolding
1 day
1 day
1/20/21
100%
1.4.11.3 Drain Lube Oil di line piping
1 day
1 day
1/21/21
100%
1.4.11.4 Pemotongan line DN80
5 days
5 days 1/22/21
100%
1.4.11.5 Pemotongan line DN150
5 days
5 days 1/22/21
100%
1.4.11.6 Setting titik pemasangan Strainer & Isolate Valve
5 days
5 days 1/22/21
100%
1.4.11.7 Welding Flange
5 days
5 days 1/22/21
100%
1.4.11.8 Setting Joint Flange to Flange Valve & Strainer
5 days
5 days 1/22/21
100%
1.4.11.9 Welding Full Joint
5 days
5 days 1/22/21
100%
1.4.11.10 NDT
5 days
5 days 1/22/21
100%
1.4.11.11 Pemasangan Gate Valve dan Strainer
2 days
2 days 1/27/21
100%
1.4.11.12 Pemasangan Tangga Akses Strainer & Valve
2 days
2 days 1/27/21
1 day
1 day
100%
1.4.11.13 Commisioning
MITRA BRU 11 days
11 days 1/19/21
1/29/21
100%
1.4.12 RLA CONDENSER
MSU Services14 days
14 days 1/28/21
100%
1.4.13 RLA GENERATOR
MSU Services14 days
14 days 1/28/21
100%
1.4.14 202015909 -_(Unit 1) valve outlet HPFF no.3 leakthrough | Valve
HAR
3 days
DN200 butterfly MO V leankage | Dilaksanakan saat SI
1.4.15 202010536_"Unit 1 GSF A vibrasi status warning | No. Doc 11 | Sudah MITRA BRU 7 days
terkontrak den gan mitra, kendala Covid-
3 days 1/19/21
7 days 1/22/21
16
21
26
February 2021
31
5
10
15
20
25
March 2021
2
7
SI PLUS UNIT 1 & MO UNIT 2
(17 Jan - 7 Mar 2021 & 17 Jan - 6 Feb 2021)
ID Task%
Task Name
Mode
Complete
140
100%
141
100%
142
100%
143
100%
144
100%
145
146
100%
147
148
100%
149
100%
150
151
100%
152
100%
153
100%
154
100%
155
100%
156
100%
157
100%
158
100%
100%
100%
100%
PIC
Actual
Duration
Start
Duration
1.4.16 202010534_UNIT 1 IDF A Vibrasi status Alarm di sisi DE Fan | Estimasi
Pengerjaan Mi n 10 Hari | Dilaksanakan saat SI Plus Bulan September
1.4.17 202012833_(UNIT 1) Pengecekan Kebocoran pada Housing fan CDAF
| Dilakukan pe ngecekan, bila lebih > 4 hari pelaksanaan akan dilaksanakan
saat SI Bula n September |
1.4.18 202013001_(Unit 1) MOV Regulate By pass Feed water : Kebocoran
valve | Dilaksan akan saat SI Plus Bulan September | Waktu pengerjaan lebih
dari 5 hari
1.4.19 202010521_(Unit 1) Terdapat kebocoran pada safety valve drum sisi
kantor | Butuh pembongkaran valve serta sertifikasi stlh pembongkaran |
Dilaksanakan saat SI Plus Bulan September
1.4.20 202013829_(Unit 1) Hydraulic control water ekstraksi no.3: tidak bisa
dimanuver ko ndisi masih close | Dilaksanakan saat SI
1.4.21 202014165_(UNIT 1) TURBIN VALVE LEAK (dikerjakan saat SI)
MSU
7 days
7 days 1/27/21
MSU
7 days
7 days 2/3/21
1.4.22 202014751_(UNIT 1) Kebocoran oli pada bearing turbin no 2 |
Pengecekan saat SI |
1.4.23 202012843_(CAH) Trafo ESP : 1.3 hunting-hunting
MITRA MSU 7 days
7 days 1/22/21
MITRA MSU 7 days
7 days 1/29/21
MITRA MSU 7 days
7 days 2/5/21
MITRA MSU 7 days
7 days 2/12/21
MSU
14
1/22/21
days
14 days 1/22/21
14 days
MITRA MSU 14 days
16
21
26
February 2021
31
5
10
15
20
25
March 2021
2
7
1.4.24 202012988_(CAH) Trafo 1.1 : Tegangan tidak bisa naik & tangkapan MITRA MSU 14 days
14
1/22/21
fly ash tidak mak simal
days
1.4.25
MSU
7 days
7 days 2/1/21
201811035_CM HL (UNIT 1) : Temperatur winding tinggi pada Trafo UAT | Investasi Tahun 2020 | Material Sudah Tiba 30 April 2020 | Pengadaan Winding TI | Di Pasang Pada Saat SI Unit 1 SEPTEMBER
1.4.26 201816056_CM HL (Unit 1) : Pembacaan oil temperature auxiiary transformer
MSU high |7 Investasi
days
Tahun
7 days
2020
2/1/21
| Material Sudah Ada | Di Agendakan Saat SI Unit 1 SEPTEMBER 2020
1.4.27 202018384_(Unit 1) Perbaikan Jalur Drain HPH 1: kebocoran |
Dilaksanakan saat SI
1.4.28 202018388_(Unit 1) Perbaikan Pembacaan Temperatur Bed Furnace
no.7 ubnormal | Dilaksanakan pada saat MO
1.4.29 202017262_(Unit 1) Perbaikan Hydraulic Coupling IDF B tidak bisa
dimanuver dari DCS | Dilaksanakan saat SI Unit 1 | Sudah di Kalibrasi, masih
1.4.30 202016748_(Unit 1) Perbaikan Vibrasi pada motor dan fan CDAF unit
1 Status alarm vibrasi | Dilaksanakan saat SI Unit 1
1.4.31 202016754_(Unit 1) Perbaikan Kebocoran air pada jalur pendinginan
bottom ash cooler A | Dilaksanakan saat SI Unit 1
1.4.32 202016755_(Unit 1) Perbaikan Kebocoran air pada jalur pendinginan
bottom ash cooler B | Dilaksanakan saat SI
1.4.33 202016543_(Unit 1) Perbaikan Isolasi line CDAF sisi kantor terlepas |
Dilaksanakan saat SI Unit 1
1.4.34 202016544_(Unit 1) Perbaikan Isolasi bottom header furnace terlepas
| Dilaksanakan saat SI Unit 1
HM
7 days
7 days 1/21/21
MSU
3 days
3 days 2/12/21
MSU
5 days
5 days 1/24/21
MSU
14 days
HM
4 days
14
1/24/21
days
4 days 1/24/21
HM
4 days
4 days 1/28/21
MITRA MSU 4 days
4 days 1/24/21
MITRA MSU 4 days
4 days 1/28/21
SI PLUS UNIT 1 & MO UNIT 2
(17 Jan - 7 Mar 2021 & 17 Jan - 6 Feb 2021)
ID Task%
Task Name
Mode
Complete
159
100%
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
99%
183
184
185
100%
100%
PIC
1.4.35 202015905_(Common) Perbaikan Kebocoran line interconnecting
CWP di area CWP house, luar gedung intake | Dilaksanakan saat SI unit 1
1.5 INVESTASI IP
1.5.1 REHABILITASI REFRACTORY
HM
Actual
Duration
Start
Duration
5 days
5 days 2/2/21
42.26 days 42.55 days
1/21/21
MITRA BRU 18 days
18 days 1/25/21
14 days
14 days 1/25/21
1.5.1.1 REFRACTORY WORK IN WINDBOX AREA
100%
1.5.1.1.1 Preparation & Old Refractory Demolition + Cleaning
6 days
6 days 1/25/21
100%
1.5.1.1.2 Stainless Anchor Welding
3 days
3 days 1/31/21
100%
1.5.1.1.3 Dent Tube Repair (If Any)
3 days
3 days 1/31/21
100%
1.5.1.1.4 Boiler Hydro Test (Jika Memungkinkan)/Thicness & Visual Check
1 day
1 day
100%
1.5.1.1.5 Panel Formwork Assembly
2 days
2 days 2/4/21
100%
1.5.1.1.6 Casting & Shotcrete Installation
2.5 days
2.5 days2/4/21
1.5.1.1.7 Fhinishing & Cleaning
1.5 days
1.5 days2/6/21
18 days
18 days 1/25/21
100%
100%
1.5.1.2 REFRACTORY WORK IN FURNACE, WING WALL & UPPER FURNACE
2/3/21
100%
1.5.1.2.1 Preparation & Old Refractory Demolition + Cleaning
6 days
6 days 1/25/21
100%
1.5.1.2.2 Stainless Anchor Welding
3 days
3 days 1/31/21
100%
1.5.1.2.3 Dent Tube Repair (If Any)
4 days
4 days 1/30/21
100%
1.5.1.2.4 Boiler Hydro Test (Jika Memungkinkan)/Thicness & Visual Check
1 day
1 day
100%
1.5.1.2.5 Panel Formwork Assembly
5 days
5 days 2/4/21
100%
1.5.1.2.6 Casting & Shotcrete Installation
6 days
6 days 2/5/21
1.5.1.2.7 Fhinishing & Cleaning
1 day
1 day
18 days
18 days 1/25/21
100%
100%
1.5.1.3 REFRACTORY WORK IN INLET CYCLONE, CYCLONE & CYCLONE ROOF
2/3/21
2/11/21
100%
1.5.1.3.1 Preparation & Old Refractory Demolition + Cleaning
6 days
6 days 1/25/21
100%
1.5.1.3.2 Stainless Anchor Welding
2 days
2 days 1/31/21
100%
1.5.1.3.3 Dent Tube Repair (If Any)
3 days
3 days 1/31/21
100%
1 day
1 day
100%
1.5.1.3.4 Boiler Hydro Test (Jika Memungkinkan)/Thicness & Visual
Check
1.5.1.3.5 Panel Formwork Assembly
6 days
6 days 2/4/21
100%
1.5.1.3.6 Casting & Shotcrete Installation
7 days
7 days 2/4/21
100%
1.5.1.3.7 Fhinishing & Cleaning
1 day
1 day
2/3/21
2/11/21
16
21
26
February 2021
31
5
10
15
20
25
March 2021
2
7
SI PLUS UNIT 1 & MO UNIT 2
(17 Jan - 7 Mar 2021 & 17 Jan - 6 Feb 2021)
ID Task%
Task Name
Mode
Complete
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
100%
PIC
12 days
12 days 1/25/21
100%
1.5.1.4.1 Preparation & Old Refractory Demolition + Cleaning
4 days
4 days 1/25/21
100%
1.5.1.4.2 Stainless Anchor Welding
2 days
2 days 1/29/21
100%
1.5.1.4.3 Panel Formwork Assembly
4.5 days
4.5 days1/31/21
100%
1.5.1.4.4 Casting & Shotcrete Installation
6 days
6 days 1/31/21
100%
1.5.1.4.5 Fhinishing & Cleaning
1 day
1 day
100%
1.5.1.4 REFRACTORY WORK IN COD (CYCLONE OUTLET DUCT)
Actual
Duration
Start
Duration
17 days
17 days 1/25/21
100%
1.5.1.5.1 Preparation & Old Refractory Demolition + Cleaning
6 days
6 days 1/25/21
100%
1.5.1.5.2 Stainless Anchor Welding
4 days
4 days 1/29/21
100%
1.5.1.5.3 Panel Formwork Assembly
7 days
7 days 2/1/21
100%
1.5.1.5.4 Casting & Shotcrete Installation
8 days
8 days 2/2/21
1.5.1.5.5 Fhinishing & Cleaning
100%
1.5.1.5 REFRACTORY WORK IN DOWN COMER AND SEALPOT
2/5/21
1 day
1 day
2/10/21
100%
1.5.2 REFRACTORY BED FURNACE
1 day
1 day
2/28/21
14%
1.5.3 RDO
0.28 days
2 days 3/1/21
0%
1.5.4 Final Check
0 days
1 day
100%
1.5.5 COATING WALLTUBE BOILER
MITRA BRU 6 days
3/3/21
6 days 2/18/21
100%
1.5.5.1 Instalasi Mesin dan Peralatan
1 day
1 day
2/18/21
100%
1.5.5.2 Pengambilan data thickness Sebelum Coating
1 day
1 day
2/18/21
100%
1.5.5.3 Sandblasting dilanjut Metal Coating area 8m2/hari (total 40M2)
4 days
4 days 2/19/21
100%
1.5.5.4 Pengambilan data Thickness Pasca Coating
1 day
1 day
2/22/21
100%
1.5.5.5 Aplikasi Sealant
1 day
1 day
2/23/21
100%
1.5.5.6 Final Inspection & Cleaning area kerja
1 day
1 day
2/22/21
100%
1.5.6 COATING POMPA DAN PIPA CWP #1 DAN #2
MITRA BRU 14 days
14 days 1/22/21
100%
1.5.6.1 Set Up Equipment
1 day
1 day
1/22/21
100%
1.5.6.2 Install Scafolding + Chamber Blast
1 day
1 day
1/22/21
100%
1.5.6.3 Cleaning Internal Pipa Circulating Water
3 days
3 days 1/23/21
100%
1.5.6.4 Prepare Blasting Pompa
1 day
1 day
100%
1.5.6.5 Blasting/Coating Pompa
2 days
2 days 1/25/21
1/24/21
16
21
26
February 2021
31
5
10
15
20
25
March 2021
2
7
SI PLUS UNIT 1 & MO UNIT 2
(17 Jan - 7 Mar 2021 & 17 Jan - 6 Feb 2021)
ID Task%
Task Name
Mode
Complete
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
PIC
Actual
Duration
Start
Duration
100%
1.5.6.6 Prepare Blasting Pipa Circulating Water
1 day
1 day
100%
1.5.6.7 Blasting Internal Pipa Circulating Water
2 days
2 days 1/28/21
100%
1.5.6.8 1st Coat Pipa Circulating Water
1 day
1 day
100%
1.5.6.9 Touch Up & Filler Coat Pipa
2 days
2 days 1/30/21
100%
1.5.6.10 2nd Coat Pipe Circulating Water
1 day
1 day
2/1/21
100%
1.5.6.11 Check DFT & NDT Pompa & Pipa
1 day
1 day
2/2/21
100%
1.5.6.12 Touch Up Low Thickness & Pinhole
1 day
1 day
2/3/21
100%
1.5.6.13 Final Inspection
1 day
1 day
2/4/21
100%
1.5.7 Penggantian Fleksible Joint Boiler
100%
1.5.7.1 Pembongkaran EJF lama
MITRA BRU 14 days
1/27/21
1/29/21
14 days 1/21/21
5 days
5 days 1/21/21
100%
1.5.7.1.1 EJF Cyclone to HRA 1 set
5 days
5 days 1/21/21
100%
1.5.7.1.2 EJF Furnace to Cyclone Side B 1 set
5 days
5 days 1/21/21
100%
1.5.7.1.3 EJF Line Coal Feedeing Air Duct 500x600 L350 (1)
5 days
5 days 1/21/21
100%
1.5.7.1.4 EJF Line Coal Feedeing Air Duct 500x600 L350 (2)
5 days
5 days 1/21/21
100%
1.5.7.1.5 EJF Line Hot Secondary Air Duct 1000x1000x350 (1)
5 days
5 days 1/21/21
100%
1.5.7.1.6 EJF Line Hot Secondary Air Duct 1000x1000x350 (2)
5 days
5 days 1/21/21
100%
1.5.7.1.7 EJF Line Hot Secondary Air Duct 1000x1000x350 (3)
5 days
5 days 1/21/21
100%
1.5.7.1.8 EJF Line Hot Secondary Air Duct 1000x1000x350 (4)
5 days
5 days 1/21/21
100%
1.5.7.1.9 EJF Line Hot Secondary Air Duct 1000x1000x1050 (1)
5 days
5 days 1/21/21
100%
1.5.7.1.10 EJF Line Hot Secondary Air Duct 1000x1000x1050 (2)
5 days
5 days 1/21/21
100%
1.5.7.1.11 EJF Line Hot Primary Air Duct 1600x1000x350 (1)
5 days
5 days 1/21/21
100%
1.5.7.1.12 EJF Line Hot Primary Air Duct 1600x1000x350 (2)
5 days
5 days 1/21/21
100%
1.5.7.1.13 EJF Line Hot Primary Air Duct 1200x1400x350 (1)
5 days
5 days 1/21/21
100%
1.5.7.1.14 EJF Line Hot Primary Air Duct 1200x1400x350 (2)
5 days
5 days 1/21/21
100%
1.5.7.1.15 EJF Line Hot Primary Air Duct 800x600x350 (1)
5 days
5 days 1/21/21
100%
1.5.7.1.16 EJF Line Hot Primary Air Duct 800x600x350 (2)
5 days
5 days 1/21/21
100%
1.5.7.1.17 EJF Line Hot Primary Air Duct 800x600x350 (3)
5 days
5 days 1/21/21
100%
1.5.7.1.18 EJF Line Hot Primary Air Duct 800x600x150 (1)
5 days
5 days 1/21/21
16
21
26
February 2021
31
5
10
15
20
25
March 2021
2
7
SI PLUS UNIT 1 & MO UNIT 2
(17 Jan - 7 Mar 2021 & 17 Jan - 6 Feb 2021)
ID Task%
Task Name
Mode
Complete
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
PIC
Actual
Duration
Start
Duration
100%
1.5.7.1.19 EJF Line Hot Primary Air Duct 800x600x150 (2)
5 days
5 days 1/21/21
100%
1.5.7.1.20 EJF Line Hot Primary Air Duct DN800 x 150 (1)
5 days
5 days 1/21/21
100%
1.5.7.1.21 EJF Line Hot Primary Air Duct DN800 x 150 (2)
5 days
5 days 1/21/21
100%
7 days
7 days 1/26/21
100%
1.5.7.2.1 EJF Cyclone to HRA 1 set
7 days
7 days 1/26/21
100%
1.5.7.2.2 EJF Furnace to Cyclone Side B 1 set
7 days
7 days 1/26/21
100%
1.5.7.2.3 EJF Line Coal Feedeing Air Duct 500x600 L350 (1)
7 days
7 days 1/26/21
100%
1.5.7.2.4 EJF Line Coal Feedeing Air Duct 500x600 L350 (2)
7 days
7 days 1/26/21
100%
1.5.7.2.5 EJF Line Hot Secondary Air Duct 1000x1000x350 (1)
7 days
7 days 1/26/21
100%
1.5.7.2.6 EJF Line Hot Secondary Air Duct 1000x1000x350 (2)
7 days
7 days 1/26/21
100%
1.5.7.2.7 EJF Line Hot Secondary Air Duct 1000x1000x350 (3)
7 days
7 days 1/26/21
100%
1.5.7.2.8 EJF Line Hot Secondary Air Duct 1000x1000x350 (4)
7 days
7 days 1/26/21
100%
1.5.7.2.9 EJF Line Hot Secondary Air Duct 1000x1000x1050 (1)
7 days
7 days 1/26/21
100%
1.5.7.2.10 EJF Line Hot Secondary Air Duct 1000x1000x1050 (2)
7 days
7 days 1/26/21
100%
1.5.7.2.11 EJF Line Hot Primary Air Duct 1600x1000x350 (1)
7 days
7 days 1/26/21
100%
1.5.7.2.12 EJF Line Hot Primary Air Duct 1600x1000x350 (2)
7 days
7 days 1/26/21
100%
1.5.7.2.13 EJF Line Hot Primary Air Duct 1200x1400x350 (1)
7 days
7 days 1/26/21
100%
1.5.7.2.14 EJF Line Hot Primary Air Duct 1200x1400x350 (2)
7 days
7 days 1/26/21
100%
1.5.7.2.15 EJF Line Hot Primary Air Duct 800x600x350 (1)
7 days
7 days 1/26/21
100%
1.5.7.2.16 EJF Line Hot Primary Air Duct 800x600x350 (2)
7 days
7 days 1/26/21
100%
1.5.7.2.17 EJF Line Hot Primary Air Duct 800x600x350 (3)
7 days
7 days 1/26/21
100%
1.5.7.2.18 EJF Line Hot Primary Air Duct 800x600x150 (1)
7 days
7 days 1/26/21
100%
1.5.7.2.19 EJF Line Hot Primary Air Duct 800x600x150 (2)
7 days
7 days 1/26/21
100%
1.5.7.2.20 EJF Line Hot Primary Air Duct DN800 x 150 (1)
7 days
7 days 1/26/21
1.5.7.2.21 EJF Line Hot Primary Air Duct DN800 x 150 (2)
7 days
7 days 1/26/21
2 days
2 days 2/2/21
100%
100%
100%
100%
1.5.7.2 Pemasangan EJF Baru
1.5.7.3 Final Check & Cleaning Area Kerja
1.6 PEKERJAAN PLN
1.6.1 Pemasangan Auto Backwash Strainer TOC & GAC
33.04 days 33.04 days
1/17/21
MITRA PLN 13 days
13 days 1/25/21
16
21
26
February 2021
31
5
10
15
20
25
March 2021
2
7
SI PLUS UNIT 1 & MO UNIT 2
(17 Jan - 7 Mar 2021 & 17 Jan - 6 Feb 2021)
ID Task%
Task Name
Mode
Complete
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
PIC
Actual
Duration
Start
Duration
100%
1.6.1.1 Safety Permitte
1 day
1 day
1/25/21
100%
1.6.1.2 Persiapan Alat Kerja
1 day
1 day
1/26/21
100%
1.6.1.3 Relokasi Material
1 day
1 day
1/27/21
100%
1.6.1.4 Pembongkaran Backwash Strainer GAC Existing
1 day
1 day
1/27/21
100%
1.6.1.5 Instalasi Backwash Strainer GAC Baru
4 days
4 days 1/27/21
100%
1.6.1.6 Instalasi Electrical
2 days
2 days 1/30/21
100%
1.6.1.7 Commisioning Test
2 days
2 days 1/31/21
100%
1.6.1.8 Pembongkaran Backwash Strainer TOC Existing
1 day
1 day
100%
1.6.1.9 Instalasi Backwash Strainer TOC Baru
3 days
3 days 2/2/21
100%
1.6.1.10 Instalasi Electrical
2 days
2 days 2/4/21
100%
1.6.1.11 Commisioning Test
2 days
2 days 2/5/21
1 day
1 day
100%
100%
1.6.1.12 Clearance
1.6.2 Pemasangan Line Pipa SWRO|membutuhkan stop 2 unit
MITRA PLN 28 days
2/2/21
2/6/21
28 days 1/17/21
100%
1.6.2.1 Pembongkaran Line Existing (SWRO A & B)
7 days
7 days 1/17/21
100%
1.6.2.2 Pembongkaran tembok untuk line pipa baru (modifikasi)
3 days
3 days 1/21/21
100%
1.6.2.3 Pemasangan Support Pipa Baru (SWRO A dan B)
5 days
5 days 1/23/21
100%
1.6.2.4 Fitting Up Line Pipa Baru (SWRO A)
7 days
7 days 1/24/21
100%
1.6.2.5 Assembly line Pipa Baru (SWRO A)
7 days
7 days 1/25/21
100%
1.6.2.6 Tapping & Welding (SWRO A)
3 days
3 days 1/30/21
100%
1.6.2.7 Fitting Up Line Pipa Baru (SWRO B)
10 days
10 days 1/24/21
100%
1.6.2.8 Assembly line Pipa Baru (SWRO B)
10 days
10 days 1/26/21
100%
1.6.2.9 Tapping & Welding (SWRO B)
7 days
7 days 2/3/21
100%
1.6.2.10 Pemasangan Bypass SWRO A & B
2 days
2 days 2/10/21
100%
1.6.2.11 Finishing & Repainting
6 days
6 days 2/5/21
100%
1.6.2.12 Cleaning Area SWRO A
2 days
2 days 2/1/21
100%
1.6.2.13 Cleaning Area SWRO B
2 days
2 days 2/10/21
100%
1.6.2.14 Commisioning Test SWRO A
3 days
3 days 2/1/21
100%
1.6.2.15 Commisioning Test SWRO B
3 days
3 days 2/11/21
16
21
26
February 2021
31
5
10
15
20
25
March 2021
2
7
SI PLUS UNIT 1 & MO UNIT 2
(17 Jan - 7 Mar 2021 & 17 Jan - 6 Feb 2021)
ID Task%
Task Name
Mode
Complete
298
299
300
301
302
303
304
305
306
307
308
309
100%
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
1.6.3 Penggantian Discharge Valve CWP 1 dan 2
PIC
Actual
Duration
Start
Duration
MITRA PLN 14 days
14 days 2/5/21
99%
1.7 STANDARD SCOPE SI+
MSU
0%
1.8 PENGISIAN MATERIAL BED
MITRA MSU 0 days
0.5 days3/4/21
0%
1.9 FIRING
OP
0 days
1.5 days3/5/21
0%
1.10 ROLLING & PENGETESAN
OP,HAR,MSU0 days
1.5 days3/6/21
0%
1.11 SINCRON
OP
1 hr
100%
2 MO UNIT 2 PLTU BARRU OMU
27.72 days 28 days 1/17/21
0 hrs
3/8/21
20.04 days 20.04 days
1/17/21
100%
2.1 SHUTDOWN
OP
1 hr
1 hr
1/17/21
100%
2.2 COOLING DOWN BOILER
OP
2 days
2 days 1/17/21
100%
2.3 TURNING GEAR OFF
OP
5 days
5 days 1/17/21
100%
2.4 DRAIN MATERIAL BED
OP
3 days
3 days 1/17/21
100%
OP,HAR
1 day
1 day
1/20/21
100%
2.5 INSPEKSI REFRACTORY
FURNACE,WINDBOX,INTERCONNECTING,CYCLONE,HRA,SEALPOT
2.6 INSPEKSI NOZZLE BOILER DAN CYCLONE
OP,ENG
1 day
1 day
1/20/21
100%
2.7 202015915_PEKERJAAN PENGGANTIAN PIPA OUTLET CONDENSER
MITRA BRU 20 days
20 days 1/17/21
100%
2.7.1 KURAS GENANGAN AIR DAN GALIAN TANAH
4 days
4 days 1/17/21
100%
2.7.2 BONGKAR BETON SISI KUNIT & SISI TRAFO
4 days
4 days 1/18/21
100%
2.7.3 PENGURASAN AIR TUNNEL DAN PIPA
3 days
3 days 1/22/21
100%
2.7.4 PEMBONGKARAN PIPA SIDE A
2 days
2 days 1/24/21
100%
2.7.5 PEMASANGAN PIPA SIDE A
3 days
3 days 1/26/21
100%
2.7.6 PEMBONGKARAN PIPA SIDE B
2 days
2 days 1/26/21
100%
2.7.7 PEMASANGAN PIPA SIDE B
3 days
3 days 1/28/21
100%
2.7.8 PENGECORAN BETON DINDING TUNNEL
1 day
1 day
1/31/21
100%
2.7.9 PENGECORAN BETON DINDING DRAIN PIT
1 day
1 day
1/31/21
100%
2.7.10 PEKERJAAN PENIMBUNAN TANAH
4 days
4 days 2/1/21
100%
2.7.11 CLEANING AREA KERJA
1 day
1 day
100%
100%
2.8 PEKERJAAN COATING OUTLET CONDENSER
2.8.1 Persiapan Peralatan Material
MITRA BRU 10 days
1 day
2/5/21
10 days 1/22/21
1 day
1/22/21
16
21
26
February 2021
31
5
10
15
20
25
March 2021
2
7
SI PLUS UNIT 1 & MO UNIT 2
(17 Jan - 7 Mar 2021 & 17 Jan - 6 Feb 2021)
ID Task%
Task Name
Mode
Complete
PIC
Actual
Duration
Start
Duration
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
100%
2.8.2 Pemasangan Scafolding
1 day
1 day
1/23/21
100%
2.8.3 Melepas Elbow Outlet Condenser
1 day
1 day
1/24/21
100%
2.8.4 Surface Preparation SIDE B
1 day
1 day
1/25/21
100%
2.8.5 Aplikasi Primer
1 day
1 day
1/25/21
100%
2.8.6 Aplikasi Top Coat
1 day
1 day
1/25/21
100%
2.8.7 inspeksi Thickness
0.5 days
0.5 days1/26/21
100%
2.8.8 Pemasangan Elbow Outlet Condenser
2 days
2 days 1/26/21
100%
2.8.9 Membuka spacer pipe
1 day
1 day
1/28/21
100%
2.8.10 Surface Preparation
1 day
1 day
1/29/21
100%
2.8.11 Aplikasi Primer
1 day
1 day
1/29/21
100%
2.8.12 Aplikasi Top Coat
1 day
1 day
1/29/21
100%
2.8.13 Inspeksi Thickness
1 day
1 day
1/30/21
100%
2.8.14 Pemasangan Spacer pipa
1 day
1 day
1/30/21
100%
2.8.15 Cleaning area kerja
1 day
1 day
1/31/21
351
100%
100%
2.9 Penggantian Pipa Outlet TOC dan GAC
MITRA BRU 7 days
7 days 1/22/21
100%
2.9.1 Pembongkaran Pipa TOC
1 day
1 day
1/22/21
100%
2.9.2 Pembongkaran Pipa GAC
1 day
1 day
1/23/21
100%
2.9.3 Fitting dan Pemasangan Pipa TOC Baru
3 days
3 days 1/23/21
100%
2.9.4 Fitting dan Pemasangan Pipa GAC Baru
3 days
3 days 1/24/21
100%
2.9.5 Final Check
1 day
1 day
1/27/21
100%
2.9.6 Pengecatan & Cleaning Area Kerja
1 day
1 day
1/28/21
100%
2.10 Penggantain Discharge Valve CWP 3 dan 4
MITRA PLN 14 days
14 days 1/20/21
100%
2.11 Penggantain Vacuum Pump B
MITRA BRU 14 days
14 days 1/20/21
100%
2.12 PERBAIKAN TEMUAN KERUSAKAN REFRACTORY
HAR
10 days
10 days 1/21/21
100%
2.13 PERBAIKAN TEMUAN KERUSAKAN NOZZLE
HAR
10 days
10 days 1/21/21
100%
2.14 202013778-(Unit2) Line Outlet pendingan BAC 1: bocor (sementara diikat HAR
3 days
menggunakan karet) |membutuhkan stop 2 unit
2.15 202018209_(unit 2) valve balancing BFP-B indikasi leakthrough| Dilaksanakan
HM
saat MO Unit
2 days
2
3 days 1/22/21
2 days 1/20/21
16
21
26
February 2021
31
5
10
15
20
25
March 2021
2
7
SI PLUS UNIT 1 & MO UNIT 2
(17 Jan - 7 Mar 2021 & 17 Jan - 6 Feb 2021)
ID Task%
Task Name
Mode
Complete
PIC
Actual
Duration
Start
Duration
16
21
26
February 2021
31
5
10
15
352
353
354
355
356
357
100%
2.16 202016756_(Unit 2) Kebocoran air pada jalur pendinginan bottom ash coolerHM
B | Dilaksanakan
4 dayssaat MO
4 days 1/23/21
100%
2.17 202015908_WO FU HMBB : Housing valve manual dari discharge CWP menuju
HMline SWP pecah
2 days| Dilaksanakan
2 days 1/22/21
saat 2 Unit Stop | Housing valve interconnecting backwash to SWP
100%
2.18 202015927_(Common) Pressure Outlet OCWP tidak terbaca di DCS (line transmitter
HKI
buntu)
2 days
| Dilaksanakan
2 dayssaat
1/23/21
2 Unit Stop
100%
2.19 202015823_WO FU : VALVE INLET SPRAY TBS DARI CWP 4 TIDAK BISA DIMANUVER
HM
| READY
1 day
VALVE BUTTERFLY
1 day 1/24/21
DN 200 | Dilaksanakan saat 2 Unit Stop
100%
2.20 202015148_(Unit 2) kebocoran air pendingin pada outlet BAC no. 2 | Dilaksanakan
HM
saat 24Unit
daysStop 4 days 1/27/21
100%
358
359
360
361
362
100%
2.21
HAR
4 days
4 days 1/25/21
202010714_Kebocoran line outlet OCWP B | Sudah ditambal dengan rubber sementara karena butuh las PVC | dilaksanakan
saat SI SEPTEMBER
2.22 PENGISIAN MATERIAL BED
OP
1 day
1 day 1/31/21
100%
2.23 FINAL CHECK
OP
1 day
1 day
2/2/21
100%
2.24 FIRING
OP
1 day
1 day
2/3/21
100%
2.25 ROLLING DAN PENGETESAN
OP
1 day
1 day
2/4/21
100%
2.26 SINCRON
OP
1 day
1 day
2/5/21
20
25