Bongkar Pondasi Pekerja 0.565 OH 100,000 565,000 Tukang Batu 0.275 OH 115,000 31,625 Tukang Kayu 1.56 OH 115,000 179,400 Tukang Besi 1,4 OH 115,000 161,000 Kepala Tukang 0.323 OH 130,000 41,990 Mandor 0.283 OH 150,000 42,450 Total 1,021,465 Alat 30% 306439.5 Harga satuan 1,327,905 7,624,828 m3 Volume Bongkar Frame Frame UNP 700 x 2700 5.742 m3 306.1333 kg 3500 1,071,467 Bongkar Pondasi + bongkar Frame 8,696,294 1304444.146 10,000,738 10,000,000 15% Harga Pembongkaran dibulatkan Pembuatan Pondasi Baru Uraian Koef. Satuan Harga Satuan Jumlah Kayu Kelas III 0.27 m3 700,000 189,000 Paku 5cm-12cm 2 Kg 18,000 36,000 Minyak bekisting 0.6 Liter 12,000 7,200 Besi beton polos 210 Kg 11,000 2,310,000 Kawat beton 3 Kg 10,000 30,000 PC / portland cement 336 Kg 1,300 436,800 PB / pasir beton 0.54 m3 200,000 108,000 KR / Kerikil 0.81 m3 180,000 145,800 Pekerja 0.565 OH 100,000 565,000 Tukang Batu 0.275 OH 115,000 31,625 Tukang Kayu 1.56 OH 115,000 179,400 Tukang Besi 1,4 OH 115,000 161,000 Kepala Tukang 0.323 OH 130,000 41,990 Mandor 0.283 OH 150,000 42,450 Total 4,284,265 Alat 20% 856853 Total 5.742 15% Volume margin Total 5,141,118 29,520,299.56 4,428,044.93 33,948,344.49 Pembuatan dan Pemasangan Material Frame UNP 700 x 2700 306.1333 kg Jasa Material & Jasa 306.1333 16000 4,898,133 4000 1,224,533 6,122,667 918,400.00 7,041,066.67 15%