RENCANA AMGGARAN BIAYA (RAB) DAN
RENCANA KERJA & SYARAT-SYARAT
(RKS)
TUGAS AKHIR
PERENCANAAN PUSAT ROBOTIKA
DI PULAU KUMALA TENGGARONG KUTAI
KARTANEGARA
PENEKANAN PADA GAYA INTERIOR FUTURISTIK
Oleh:
RINA RAHMAWATI
NIM : 17619024
KEMENTERIAN PENDIDIKAN DAN KEBUDAYAAN
POLITEKNIK NEGERI SAMARINDA
JURUSAN DESAIN
PROGRAM STUDI ARSITEKTUR
SAMARINDA
2020
DAFTAR ISI
DAFTAR ISI................................................................................................
i
RENCANA ANGGARAN BIAYA ............................................................
ii
REKAPITULASI RENCANA ANGGARAN BIAYA ............................
iii
BAB I
SYARAT-SYARAT UMUM DAN ADMINISTRASI ..............
1
PASAL 1 LINGKUP PEKERJAAN ............................................
1
PASAL 2 KETENTUAN PELAKSANAAN PEKERJAAN .......
1
PASAL 3 PERATURAN TEKNIS ..............................................
2
PASAL 4 PELAKSANAAN PEKERJAAN ................................
3
PASAL 5 LOKASI DAN DAERAH KERJA ..............................
4
1. Lokasi Daerah Kerja ..............................................
4
2. Lalu Lintas Pelaksanaan Pekerjaan ........................
5
3. Kondisi Lapangan ..................................................
5
4. Pengukuran dan Elevasi .........................................
6
PASAL 6 BAHAN/MATERIAL .................................................
7
1. Pengadaan Material ................................................
7
2. Perubahan Material ................................................
9
3. Pengujuan Material dan Peralatan ........................
9
a. Petunjuk Umum ...............................................
9
PASAL 7 PERALATAN..............................................................
12
PASAL 8 MOBILISASI DAN DEMOBILISASI........................
12
PASAL 9 PEMBUATAN PAPAN PROYEK DAN RAMBU
PENGAMAN ...............................................................................
13
PASAL 10 GAMBAR DETAIL ENGINEERING DESIGN
(DED) ...........................................................................................
13
PASAL 11 SHOP DRAWING DAN AS BUILLT DRAWING ......
14
1. Shop Drawing ........................................................
14
2. As Buillt Drawing ..................................................
15
PASAL 12 PERBEDAAN DALAM DOKUMEN LAMPIRAN
KONTRAK ..................................................................................
15
PASAL 13 DOKUMENTASI & PELAPORAN .........................
16
PASAL 14KESELAMATAN DAN KESEHATAN KERJA (K3)
17
1. Sistem Manajemen K3 Konstruksi ........................
17
2. Rambu Keselamatan (Safety Sign) .........................
18
PASAL 15 IZIN-IZIN ..................................................................
23
PASAL 16 GANTI RUGI ............................................................
23
PASAL 17 PERSETUJUAN PEMBERI TUGAS/PENGAWAS
LAPANGAN ................................................................................
23
PASAL 18 PEMBERITAHUAN UNTUK MEMULAI
PEKERJAAN ...............................................................................
24
PASAL 19 PEMBERI PEKERJAAN KEET, GUDANG DAN
BANGSAL KERJA ......................................................................
25
PASAL 20 PEMASANGAN PAGAR SEMENTARA
AREA PROYEK ..........................................................................
26
PASAL 21 TENAGA PELAKSANAAN PEMBORONG ..........
26
PASAL 22 KEWAJIBAN KONTRAKTOR PELAKSANA .......
27
1. Penjagaan ...............................................................
27
2. Kebersihan, Ketertiban dan Keamanan..................
27
3. Asuransi .................................................................
28
4. Penyimpanan di Lapangan .....................................
28
5. Masa Pemeliharaan ................................................
28
6. Garansi ...................................................................
29
TUGAS AKHIR 2020
BAB II
BAB III
SYARAT-SYARAT TEKNIS PENGGUNAAN
BAHAN........................................................................................
31
PASAL 1 MATERIAL & PERSYARATANNYA ......................
31
1. Semen Portland ......................................................
31
2. Agregat Halus (pasir) .............................................
31
3. Agregat Kasar (kerikil dan Batu Pecah) ................
32
4. Bekisting dan Perancah ..........................................
32
5. Air kerja .................................................................
33
6. Batu Bata ................................................................
33
7. Kaca .......................................................................
34
8. Baja Ringan ............................................................
34
9. GRC dan Gypsum ..................................................
34
10. Cat ..........................................................................
35
SYARAT-SYARAT TEKNISI PELAKSANAAN
PEKERJAAN ..............................................................................................
36
PASAL 1 PENGUKURAN BOUWPLANK ...............................
36
PASAL 2 PEKERJAAN PENULANGAN ..................................
37
PASAL 3 PEKERJAAN BEKISTING DAN PERANCAH ........
37
PASAL 4 PEKERJAAN BETON ................................................
41
PASAL 5 PEKERJAAN GALIAN TANAH ...............................
44
PASAL 6 PEKERJAAN PENGURUGAN ..................................
46
PASAL 7 PONDASI FOOT PLATE ...........................................
48
PASAL 8 PEMASANGAN PANCANG MINI PILE ..................
50
PASAL 9 PEKERJAAN PASANGAN DINDING
BATU BATA ...............................................................................
52
PASAL 10 PEKERJAAN PLESTERAN .....................................
53
PASAL 11 PEKERJAAN ALUMINIUM COMPOSITE
PANEL (ACP) ..............................................................................
53
PASAL 12 PEKERJAAN GRANIT DAN KRAMIK .................
55
PASAL 13 PEKERJAAN PLAFOND .........................................
56
PASAL 14 PEKERJAAN RANGKA ATAP BAJA RINGAN ...
58
TUGAS AKHIR 2020
PASAL 15 PEKERJAAN ATAP .................................................
60
PASAL 16 PEKERJAAN KUSEN DAN DAUN PINTU/
JENDELA ALUMINIUM ............................................................
61
PASAL 17 PEKERJAAN PENGECATAN .................................
64
PASAL 18 PEKERJAAN RAILING TANGGA DAN VOID ....
65
BAB IV SYARAT-SYARAT TEKNIS PELAKSANAAN
BAB V
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL (ME) ..
67
PASAL 1 PEKERJAAN ELEKTRIKAL DAN MEKANIKAL ..
67
SYARAT-SYARAT TEKNIS PELAKSANAAN
PEKERJAAN SANITER DAN PLUMBING ..........................
71
PASAL 1 PEKERJAAN SANITER .............................................
71
PASAL 2 PEKERJAAN PLUMBING .........................................
73
PASAL 3 PEKERJAAN IPAL/BIOSEPTICTANK &
GREASE TRAP ...........................................................................
74
BAB VI PENUTUP ..................................................................................
75
TUGAS AKHIR 2020