Goals Facts Mission Maximum number Individual identity Interaction/Privacy Ranking of values Exercise of authority Security Progression Segregation Encounters Efficiency Information exchange Bias on site elements Sound structure Efficient land use Physical comfort Life safety Sociality Individuality Encoded direction Direct entry Projected image Building quality level Spatial quality level Technical quality level Functional quality level Extent of fund Cost effectiveness Maximum return Return on investment Minimize operating costs Maintenance and operating costs Reduce life cycle costs Historic preservation Static/dynamic activities Change Growth Occupancy date Cost controlled growth Statistical data Area parameters Manpower/workloads User characteristics Community characteristics Authority structure Value of potential loss Time-motion study Traffic analysis Behavioral patterns Space adequacy Type/intensity Site analysis Soil analysis F.A.R. and G.A.C. Climate analysis Code survey Surroundings Psychological implications Point of reference Entry symbols Generic nature Cost/S.F. Building efficiency Equipment costs Area per unit Cost parameters Maximum budget Time-use factors Market analysis Energy source-costs Activities and climate factors Economic data Significance Space parameters Activities Projections Durations Escalation factors Concept Service grouping People grouping Activity grouping Priority Hierarchy Security controls Sequential flow Separated flow Mixed flow Relationships Communication Enhancement Special foundations Density Environmental controls Safety precautions Neighbors Home base Orientation Accessibility Character Quality control Cost control Efficient allocation Multi-function Merchandising Energy conservation Cost control Adaptability Tolerance Convertibility Expansibility Linear./concurrent scheduling Phasing Needs Problem Space requirement Parking requirement Outdoor space requirement Functional alternatives Site development costs Environmental influences on costs Building cost/S.F. Building efficiency Equipment costs Cost estimate analysis Energy budget (if required) Operating costs (if required) Life cycle costs (if required) Time Schedule Time/cost schedule Unique and important performance requirements which will shape building design Major form considerations which will affect building design Attitude towards the initial budget and its influence on the fabric and geometry of the building Implications of change/growth on long-range performance