PT RAUN KARYA SUKAMEMBAH Citra Harmoni, Blok I7 – 8, Sidoarjo Tel 081.2100.7689 , 085.3356.0808 [email protected]; [email protected] www.raunkarya.co.id NOVEMBER 26, 2019 PT GUNUNG MAS SAMUDRA Add. Jl. Tambak Osowilangun No.197, Tambak Osowilangun, Kec. Benowo, Surabaya 60191 Attn.: Bpk. Arief Rakhman (HRD & GA) 1. PENAWARAN No. : 015.NC/GMS/XI/2019/REV-2 2. PROYEK - PAKET MATERIAL & JASA PANEL DAN KABEL DISTRIBUSI 3. LINGKUP PEKERJAAN: MATERIAL DAN JASA SESUAI DESKRIPSI PADA NO. 4 PADA PENAWARAN DAN LIST TERLAMPIR 4. HARGA PENAWARAN No. Deskripsi Harga Material dan Jasa (Rp) A. SUB TOTAL PEKERJAAN PANEL: 2xMDP 26,500,000 B. SUB TOTAL PEKERJAAN KABEL POWER 151,500,000 C. PEKERJAAN LISTRIK KE DEPO & GATE SYSTEM 87,000,000 TOTAL HARGA MATERIAL & JASA 265,000,000 Note: Ref hasil survey ke-2 tgl 22 Nov’19 dan meeting tambahan 26Nov’19, List Pekerjaan,rincian harga, single line distribusi terlampir 5. TERMIN PEMBAYARAN No. 1. 2. 3. 4. Cara Pembayaran Uang Muka/Termin I Maks. 7 hari Setelah PO/SPK/Kontrak Pekerjaan Progress/Termin II maks. 7 hari Setelah material Panel dan Kabel Power on site disertai Berita Acara Material on Site Progress/Termin III maks. 7 hari Setelah progress pekerjaan 70% disertai Berita Acara Progress Pelunasan/Termin IV Maks. 7 hari Setelah pekerjaan selesai/Berita Acara Penyelesaian Pekerjaan Page 1 of 5 Prosentase 30% 30% 30% 10% PT RAUN KARYA SUKAMEMBAH Citra Harmoni, Blok I7 – 8, Sidoarjo Tel 081.2100.7689 , 085.3356.0808 [email protected]; [email protected] www.raunkarya.co.id Pembayaran menggunakan mata uang IDR (Indonesia Rupiah) tanpa ada pemotongan, melalui rekening dibawah ini: Nama Bank : Bank Mandiri No. Rekening : 141-001-648-773-8 Penerima : PT RAUN KARYA SUKAMEMBAH Pembayaran dilakukan dengan transfer secara langsung ke rekening bank tersebut tanpa ada pengurangan (transfer charge, bank charges, dll). 6. JADWAL PENYELESAIAN “Jadwal Penyelesaian”, adalah sebagai berikut : Komponen No. A sampai C Jadwal 4 minggu setelah termin pembayaran no. 1 diterima 7. PENGECUALIAN Penawaran belum termasuk PPN, TIDAK TERMASUK: pekerjaan sipil & struktur, ijin-ijin yang diperlukan, penyediaan listrik dan air kerja, pekerjaan lain yang jenis dan jumlahnya tidak disebutkan dalam penawaran ini, pekerjaan tambah berlaku apabila jumlah pemasangan/spek material bertambah/ada perubahan sesuai permintaan client/user. 8. MASA BERLAKU PENAWARAN Penawaran ini berlaku untuk 1 (satu) minggu dari tanggal penawaran dan akan divalidasi (jika perlu). 9. GARANSI (WARRANTY) 3 (tiga) bulan garansi pekerjaan sejak penyelesaian pekerjaan di site proyek dan tidak disebabkan kerusakan oleh pihak lain 10. HUKUM YANG MENGATUR, TEMPAT YURIDIKSI Penawaran dan kewajiban yang di identifikasikan disini diatur oleh Hukum Negara Indonesia. Semua perselisihan yang timbul dari atau sehubungan dengan penawaran diselesaikan sesuai dengan persyaratan dan ketentuan dalam penawaran ini. PT RAUN KARYA SUKAMEMBAH Ni Luh Putu Chandra Dewi Director Page 2 of 5 PT RAUN KARYA SUKAMEMBAH Citra Harmoni, Blok I7 – 8, Sidoarjo Tel 081.2100.7689 , 085.3356.0808 [email protected]; [email protected] www.raunkarya.co.id LIST PEKERJAAN_PAKET MATERIAL & JASA PANEL DAN KABEL DISTRIBUSI REV 02 No. Qty Unit 1 set 14,500,000 1 set 12,000,000 600 5 2 mtr set set 83,000,000 1 1 1 1 lot lot lot lot 21,000,000 3,000,000 3,000,000 13,000,000 17,000,000 11,500,000 2 set 10,000,000 11 Kabel Twisted AL (RSTN) 4 x 16mm (Supreme/Eterna) dan instalasi ke Depo 100 mtr 7,000,000 12 Kabel Twisted AL (RSTN) 4 x 16mm (Supreme/Eterna) dan instalasi ke Gate Item A. PEKERJAAN PANEL 1 Main Distribution Panel (MDP 1) Deskripsi Main CB 100A, 3phase, 3 pole tipe outdoor, 1 incoming, 2 outgoing terdiri dari Harga (Material & Jasa) Local Box Panel W60 x H80 x D20, standar finishing, mounting bracket MCCB Schneider 3 Phase 100 A x 1 pcs MCCB Schneider 3 Phase 50 A x 2 pcs MCB Schneider 1 Phase 10 A x 3 pcs Indikator & Aksesoris CTs, Ammeter, Vmeter, Vselect, Pilot lamps, fuses, internal wiring & busbars Cu, gland, duct, rail termasuk pemasangan di site, aksesoris untuk setting, levelling, dokumen wiring diagram 2 Main Distribution Panel (MDP2) & SDP 4, 5 Main CB 100A, 3phase, 3 pole tipe outdoor, 1 incoming, 3 outgoing terdiri dari Local Box Panel W60 x H80 x D20, standar finishing, mounting bracket MCCB Schneider 3 Phase 100 A x 1 pcs MCCB Schneider 3 Phase 50 A x 1 pcs MCB Schneider 3 Phase 20 A x 2 pcs MCB Schneider 1 Phase 10 A x 3 pcs Indikator & Aksesoris CTs, Ammeter, Vmeter, Vselect, Pilot lamps, fuses, internal wiring & busbars Cu, gland, duct, rail termasuk pemasangan di site, aksesoris untuk setting, levelling, dokumen wiring diagram B. PEKERJAAN KABEL POWER 3 Kabel Twisted AL (RSTN) 2 x 4c x 50mm (Supreme/Eterna) & instalasi 4 5 6 7 8 9 Tiang Listrik Grounding panel 9 M di atas tanah, 2 M cor bawah tanah & instalasi 2 titik dengan BC 50 Conduit Pipa PVC 1.5", clamps, elbows, joints, galian & instalasi Terminasi/Koneksi untuk semua kabel power pada point 4 s/d 9 Support/Hangers Support/hangers conduit, pipa dll Aksesories, material bantu Cable ties, schoen/pin/lugs, vinyl, electrical dop, electrical & alat bantu tape, marking, dll C. PEKERJAAN LISTRIK KE DEPO & GATE SYSTEM 10 Tiang Listrik 9 M di atas tanah, 2 M cor bawah tanah, instalasi, dan junction box panel 300 mtr 20,500,000 50 mtr 16,500,000 13 4 x 16mm (Supreme/Eterna), instalasi, galian dan perapihan 14 Kabel NYA (Grounding) 2 x 16mm (Supreme/Eterna) & instalasi 450 mtr 16,500,000 15 Conduit Pipa PVC 1.5", clamps, elbows, joints, galian & instalasi 1 2 lot set 3,500,000 7,000,000 1 lot 6,000,000 Kabel NYFGbY (RSTN) Panel junction 16 1x MCB 50A, 3ph; 6x MCB 16A, 1 ph; 3x MCB 10A, 1 ph: pilot lamp RST Aksesories, material bantu Cable ties, schoen/pin/lugs, vinyl, electrical dop, electrical 17 & alat bantu tape, marking, dll TOTAL HARGA MATERIAL & JASA Page 3 of 5 265,000,000 PT RAUN KARYA SUKAMEMBAH Citra Harmoni, Blok I7 – 8, Sidoarjo Tel 081.2100.7689 , 085.3356.0808 [email protected]; [email protected] www.raunkarya.co.id SINGLE LINE DISTRIBUSI Future SDP3 untuk panel plug-in reefer Future SDP1 untuk panel plug-in reefer Page 4 of 5 Future SDP2 untuk panel plug-in reefer PT RAUN KARYA SUKAMEMBAH Citra Harmoni, Blok I7 – 8, Sidoarjo Tel 081.2100.7689 , 085.3356.0808 [email protected]; [email protected] www.raunkarya.co.id LAYOUT PLOTTING EQUIPMENT POSISI Junction Panel 2 - Gate POSISI MDP 2 dekat PJU6 POSISI MDP 1 dekat PJU4 POSISI Junction Panel 1 - Depo POSISI LVMDP Existing – Ruang Genset POSISI PJU1 Page 5 of 5