GreenPerform Batten/ 一体化LED支架灯 BN208C Mounting instruction/ 安装说明 GB 7000 Type Desc BN208C-M001a CB IP20 A B C Pmax.(W) (W) (mm) (mm) (mm) CCT OPTICS BN208C LED40/L1200 40 57 58 1135 1.7 CW(冷白光)/NW(正白光)/WW(暖白光) S(透明)/FR(雾面) BN208C LED20/L1200 20 57 58 1135 1.7 CW(冷白光)/NW(正白光)/WW(暖白光) S(透明)/FR(雾面) S(透明)/FR(雾面) S(透明)/FR(雾面) BN208C LED20/L 600 20 57 58 573 0.75 CW(冷白光)/NW(正白光)/WW(暖白光) BN208C LED10/L 600 10 57 58 573 0.75 CW(冷白光)/NW(正白光)/WW(暖白光) C A B Accessories for Optional Type Desc Accessories Desc BY208Z MB-A Mounting bracket for Asym BY208Z MB-S Mounting bracket for Symm BY209Z MB-A Suspension bracket for Asym BY209Z MB-S Suspension bracket for Symm BY208Z SP Suspension pole 此灯具有两种光学罩分别用“S”透明和“FR”雾面标识,在灯具安装结束后请将透明罩上所附蓝色贴膜撕下。 Luminaire have 2 Optics “S”means Clear and“FR”means Frosted, Please move the protective film after the luminaires were mounted. Philips Lighting Luminaires (Shanghai) Co., Ltd. Address: No. 2688, Huyi Road, Jiading, Shanghai, China Postalcode: 201801 飞利浦灯具(上海)有限公司 地址:中国上海市嘉定区马陆镇沪宜公路2688号 邮编:201801 1 Surface Mounting BN208C 吸顶安装 2 The distance of surface mounting refer to A 吸顶安装距离参考A A X2 B 把吸顶支架固定于天花板上 Fix Mounting brackets onto ceiling using the unit of BY208Z MB-S Mounting bracket for Asym 应用配件BY208Z MB-A B(mm) A(mm) Type Desc. Mounting bracket for Symm 应用配件BY208Z MB-S BN208C LED40/L1200 823±20 20 BN208C LED20/L1200 823±20 20 BN208C LED20/L600 365±20 20 BN208C LED10/L600 365±20 20 using the unit of BY208Z MB-A 3 Power supply Connection 电源线连接 注意:接线安装时折弯不可大于120°,且 不可多次折弯以防止折弯件脱落。 Note: for Terminal block fixture 1.Bending angle should less than 120 degree during mains connection; 2.Don't bend frequently to prevent breaking. Power supply Clamp 压线 2 3x1-1.5 mm 40 φ9-13mm 6 Surface Mounting for Symm A B Connect wires (Take care of poles) 接线(注意保持极性正确) C Surface Mounting for Asym 1 2 3 1 Pole Mounting BN208C 吊杆安装 2 The distance of surface mounting refer to B 吸顶安装距离参考B C Fixing the pole to ceiling surface 将吊杆安装到顶部 Mounting bracket for Symm 应用配件BY209Z MB-S using the unit of BY209Z MB-S Mounting bracket for Asym 应用配件BY209Z MB-A using the unit of BY209Z MB-A 3.吊杆应用附件 Suspension pole 吊杆应用附件 BY208Z SP using the unit of BY208Z SP Type Desc. C(mm) BN208C LED40/L1200 843±20 BN208C LED20/L1200 843±20 BN208C LED20/L600 385±20 BN208C LED10/L600 385±20 3 注意:接线安装时折弯不可大于120°,且 不可多次折弯以防止折弯件脱落。 Note: for Terminal block fixture 1.Bending angle should less than 120 degree during mains connection; 2.Don't bend frequently to prevent breaking. Power supply Connection 电源线连接 Power supply Clamp 压线 2 3x1-1.5 mm 40 φ9-13mm 6 Connect wires (Take care of poles) 接线(注意保持极性正确) 4 Pole Mounting for Symm Pole Mounting BN208C 吊杆安装 B A C D 5 Pole Mounting for Asym 1 2 3 4 1、 The luminaire shall be installed by a qualified electrician and wired in accordance with the latest IEE electrical regulations or the national requirements 灯具应由有资格的电工安装,接线要符合IEE 电气标准或国家标准。 2、 Do not switch on before complete installation. 接线过程中,切勿通电。 3、The luminaire shall ,under no circumstance,be covered with insulation matting or similar material. 灯具不适合被隔热衬垫或类似材料覆盖。 4、The luminaire is suitable for direct mounting or normally flammable material. 灯具适合于直接安装在普通可燃材料表面。