daftar pustaka - IPB Repository

advertisement
DAFTAR PUSTAKA
Callahan Michael T, Quackkenbush Daniel G, and Rowing James E. 1992. Construction Project
Scheduling. McGraw-Hill, Inc. New York.
Clara, Lady. 2009. Metode Jalur Kritis http://clararch02.blogspot.com/2009/03/ metode-jalurkritis.html [20 Februari 2012]
Dharu Dewi dkk. 2006. Studi Sistem Pengendalian Proyek Konstruksi PLTN di Indonesia : FaktorFaktor Penghambat dan Pendukung. http://www.batan.go.id/ptrkn/file/tkpfn12/paper/
Makalalah-Peserta/Dharudewi-ppen.pdf [22 Februari 2012]
Dreger, J Brain. 1992. Project Management Effective Scheduling. The Boeing Comp. Kansas.
Dipohusodo, Istimawan. 2006. Manajemen Proyek dan Konstruksi Jilid 1. Penerbit Kanisius.
Yogyakarta.
Ervianto, Wulfram I. 2006. Eksplorasi Teknologi dalam Proyek Konstruksi. Penerbit Andi.
Yogyakarta.
Furkan, M Chandra. 2003. Perbandingan Metode Penjadwalan dengan Menggunakan Linier
Scheduling Method (LSM) dan Precedence Diagram Method (PDM) [skripsi]. Jurusan Teknik
Sipil, Fakultas Teknik, Universitas Indonesia. Depok.
Husen, Abrar. 2010. Manajemen Proyek. Penerbit Andi. Yogyakarta.
Hutchings, Jonathan F. 1996. CPM Construction Scheduler’s Manual. McGrew-Hill Comp Inc.
United States of America.
Irawan, Bayu. 2002. Peningkatan Kualitas Metode I-J dan PDM dengan Pendekatan Metode
Penjadwalan Berdasarkan Progress pada Penjadwalan Proyek Konstruksi Bangunan Gedung
Bertingkat [skripsi]. Jurusan Teknik Sipil, Fakultas Teknik, Universitas Indonesia. Depok.
Kerzner, Harold. 1995. Project Management : A System Approach to Planning, Schedulling and
Controlling. Van Nostrand Reinhold. New York.
Latief, Yusuf. 2000. Diktat Kuliah Manajemen Konstruksi, Planning (Perencanaan). Fakultas Teknik,
Universitas Indonesia. Depok.
Margayanti, Deti. 2001. Perencanaan dan Penjadwalan Pekerjaan Struktur Atas dengan Repetitive
Scheduling Method (RSM) [skripsi]. Jurusan Teknik Sipil, Fakultas Teknik, Universitas
Indonesia. Depok.
Mawengkang, Widayat Widadi W. 1998. Diktat Manajemen Proyek dan Ekonomi Teknik. Fakultas
Teknik, Universitas Indonesia. Depok.
Mockler, R.J. 1972. The Management Control Process. Prentice Hall. New Jersey.
Mulhond B, Cristian J. 1999. Risk Assement in Construction Schedules. Journal of Construction
Engineering and Management. American Society of Civil Engineers. United States of America.
Murahartawaty.
2011.
Metode
Jalur
Kritis
(CPM)
http://if29noltiga.9.forumer.com/
index.php?s=b40d3d70aec4d7d4be94e30d77c1379f&act=Attach&type=post&id=104
[21
Februari 2012]
Nunnaly, SW. 1998. Construction Method and Management Edition 4th. Prentice Hall Inc. United
States of America.
Perry, J.G, Hayes, R.W. 1985. Risk and it’s Mangement in Construction Project. Institution of Civil
Engineers. London, United Kingdom.
78
Shtub Avraham, Bard Jonathan F, and Globerson Slomo. 1994. Project Management Engineering
Technology and Implementation. Prentice Hall. New Jersey.
Soeharto, Iman. 1999. Manjemen Proyek : dari Konseptual sampai Operasional. Penerbit Erlangga.
Jakarta.
Soeharto, Iman. 1992. Manjemen Proyek Industri. Penerbit Erlangga. Jakarta.
Soekoto, Imam. 1993. Pengendalian Pelaksanaan Konstruksi. Badan Penerbit Pekerjaan Umum.
Jakarta.
Susanto. 2009. Evaluasi Kinerja Waktu dan Biaya pada Proyek Bangunan Bertingkat dengan
Pendekatan Metode Earned Value (Studi Kasus : Proyek ABC di PT. X) [skripsi]. Program
Studi Teknik Sipil, Fakultas Teknik, Universitas Indonesia. Depok.
Suyetyo, Budi. 1996. Analisis Keterlambatan sebagai Pendukung Keputusan Bagi Prestasi Pekerjaan
dengan Pendekatan “Knowledge-base System” [tesis]. Fakultas Teknik, Universitas Indonesia.
Depok.
Widayat, Widadi W. 1996. Materi Kuliah Pengantar Manajemen Proyek dan Ekonomi Teknik.
Fakultas Teknik, Universitas Indonesia. Depok.
Wikipedia. 2012. Analisis Jalur Kritis http://id.wikipedia.org/wiki/Analisis_jalur_ kritis [21 Februari
2012].
Wikipedia. 2012. Microsoft Project http://en.wikipedia.org/wiki/Microsoft_Project [28 Februari 2012]
79
Download